Optimal streaming of a single job in a two-stage flow shop

被引:35
作者
Sen, A [1 ]
Topaloglu, E [1 ]
Benli, OS [1 ]
机构
[1] Bilkent Univ, Dept Ind Engn, TR-06533 Bilkent, Turkey
关键词
production; scheduling theory; lot streaming; flow shops;
D O I
10.1016/S0377-2217(98)00203-3
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Lot streaming is moving some portion of a process batch ahead to begin a downstream operation. The problem to be considered in this paper is the following: a single job consisting of U units is to be processed on two machines in the given order. Given a fixed number of possible transfer batches between the two machines, the problem is to find the timing and the size of the transfer batches (or, sublets) so as to optimize a given criterion. The schedules can be evaluated based on job completion, sublet completion, or item completion times. In the single job lot streaming problem, minimizing job completion time corresponds to minimizing the makespan, for which formulas for optimal sublet sizes are available. In this paper, the results for the sublet and item completion time models are presented. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:42 / 62
页数:21
相关论文
共 10 条
[1]  
BAKER KR, 1988, 3 ANN C CURR ISS COM
[2]  
*BILK U DEP IND EN, 1994, IEOR9412 BILK U DEP
[3]  
CETINKAYA FC, 1994, 9424 PURD U IND ENG
[4]   LOT STREAMING IN 3-STAGE PRODUCTION PROCESSES [J].
GLASS, CA ;
GUPTA, JND ;
POTTS, CN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) :378-394
[5]   OPTIMAL AND HEURISTIC MODELS FOR LOT SPLITTING IN A FLOW-SHOP [J].
KROPP, DH ;
SMUNT, TL .
DECISION SCIENCES, 1990, 21 (04) :691-709
[6]   FLOW-SHOP SCHEDULING WITH LOT STREAMING [J].
POTTS, CN ;
BAKER, KR .
OPERATIONS RESEARCH LETTERS, 1989, 8 (06) :297-303
[7]   INTEGRATING SCHEDULING WITH BATCHING AND LOT-SIZING - A REVIEW OF ALGORITHMS AND COMPLEXITY [J].
POTTS, CN ;
VANWASSENHOVE, LN .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1992, 43 (05) :395-406
[8]   FLOWSHOP SEQUENCING PROBLEM WITH ORDERED PROCESSING TIME MATRICES [J].
SMITH, ML ;
PANWALKAR, SS ;
DUDEK, RA .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (05) :544-549
[9]   BASIC TECHNIQUES FOR LOT STREAMING [J].
TRIETSCH, D ;
BAKER, KR .
OPERATIONS RESEARCH, 1993, 41 (06) :1065-1076
[10]  
TRIETSCH D, 1987, NPS5487010