Dynamic 3D visualization of articulated construction equipment

被引:40
作者
Kamat, VR
Martinez, JC
机构
[1] Univ Michigan, Dept Civil & Environm Engn, Ann Arbor, MI 48109 USA
[2] Virginia Polytech Inst & State Univ, Dept Civil & Environm Engn, Blacksburg, VA 24061 USA
关键词
Construction equipment; Construction management; Graphic methods; Kinematics; Simulation;
D O I
10.1061/(ASCE)0887-3801(2005)19:4(356)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Dynamic three-dimensional (3D) animation can be of significant value in improving the verification validation, and communication of discrete-event simulation (DES) models of construction operations, which in turn can make the models more credible and thus useful in operations planning and decision making. This paper presents research that led to the design and implementation of practical 3D animation methods to visualize multiply-articulated construction equipment in 3D animations of simulated construction operations. Using principles of forward and inverse kinematics, the writers designed and implemented generic virtual pieces of articulated construction equipment that accept task-level instructions from external software processes. DES models can configure and instantiate specific pieces of such equipment and instruct them to perform construction tasks using simple parametric text statements that embody a construction work-like terminology. Once instructed to perform specific tasks (e.g., load soil), these "smart" pieces of equipment (e.g., backhoes) automatically decipher the sequence and amplitudes of the elemental motions their components (e.g., boom, stick) must undergo to accomplish those tasks. The animation methods are implemented in a software tool called KineMach that integrates as an add-on with the VITASCOPE visualization system.
引用
收藏
页码:356 / 368
页数:13
相关论文
共 27 条
[1]  
Craig J.J., 1989, INTRO ROBOTICS MECH, DOI 10.7227/IJEEE.41.4.11
[2]  
DENBOSCH AO, 1994, THESIS GEORGIA I TEC
[3]  
Goldstein H., 1980, Classical Mechanics
[4]  
GRANT P, 1998, P 1998 ASME DES ENG, P1
[5]   COMPUTER-AIDED PLANNING FOR HEAVY LIFTS [J].
HORNADAY, WC ;
HAAS, CT ;
OCONNOR, JT ;
WEN, J .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (03) :498-515
[6]  
Kamat V.R., 2003, ELECT J INFORM TECHN, P65
[7]   Scene graph and frame update algorithms for smooth and scalable 3D visualization of simulated construction operations [J].
Kamat, VR ;
Martinez, JC .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2002, 17 (04) :228-245
[8]   Visualizing simulated construction operations in 3D [J].
Kamat, VR ;
Martinez, JC .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2001, 15 (04) :329-337
[9]  
KAMAT VR, 2003, SYSTEMS ANAL MODELLI, V43, P455, DOI DOI 10.1080/02329290290028507
[10]  
KAMAT VR, 2003, THESIS DEP CIVIL ENV