Reply to comments on "An improved continuous-time formulation for the short-term scheduling of multipurpose batch plants"

被引:1
作者
Castro, P
Barbosa-Póvoa, APFD [1 ]
Matos, H
机构
[1] Univ Tecn Lisboa, Dept Engn Quim, Inst Super Tecn, P-1049001 Lisbon, Portugal
[2] Univ Tecn Lisboa, Ctr Estudos Gestao, Inst Super Tecn, P-1049001 Lisbon, Portugal
关键词
D O I
10.1021/ie010632+
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
引用
收藏
页码:5042 / 5042
页数:1
相关论文
共 3 条
[1]   An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants [J].
Castro, P ;
Barbosa-Póvoa, APFD ;
Matos, H .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (09) :2059-2068
[2]   Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4341-4359
[3]   Comments on "An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants" [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (22) :5040-5041