Heuristics for multimode scheduling problems with dedicated resources

被引:24
作者
Bianco, L
Dell'Olmo, P
Speranza, MG
机构
[1] Univ Roma Tor Vergata, IASI, CNR, Dept Comp Sci Syst & Prod, I-00185 Rome, Italy
[2] Univ Roma Tor Vergata, Dept Comp Sci Syst & Prod, I-00133 Rome, Italy
[3] Univ Brescia, Dept Quantitat Methods, I-25122 Brescia, Italy
关键词
dedicated resources; multiple modes; project scheduling; heuristic algorithms;
D O I
10.1016/S0377-2217(97)00347-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We study scheduling problems with multiple modes and dedicated resources arising in production and project management, which constitute a special class of the general multimode resource-constrained project scheduling problem. A task may require simultaneously a set of discrete, renewable resources to be processed and the processing can be performed in different modes, that is with different resource sets, processing times, or costs. Precedence constraints can exist among tasks. The total budget that can be allocated to the project can be limited. The problem consists of identifying a mode for each task and a starting time for its processing respecting precedence, resource, and budget constraints. A graph model and an iterative solution scheme are presented. Specific heuristic algorithms for the cases with and without budget constraints are given and computational results are discussed. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:260 / 271
页数:12
相关论文
共 13 条
[1]   SCHEDULING INDEPENDENT TASKS WITH MULTIPLE-MODES [J].
BIANCO, L ;
DELLOLMO, P ;
SPERANZA, MG .
DISCRETE APPLIED MATHEMATICS, 1995, 62 (1-3) :35-50
[2]  
BIANCO L, 1994, NAV RES LOG, V41, P959, DOI 10.1002/1520-6750(199412)41:7<959::AID-NAV3220410708>3.0.CO
[3]  
2-K
[4]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[5]   Minimizing resource availability costs in time-limited project networks [J].
Demeulemeester, E .
MANAGEMENT SCIENCE, 1995, 41 (10) :1590-1598
[6]   SCHEDULING OF PROJECT NETWORKS BY JOB ASSIGNMENT [J].
DREXL, A .
MANAGEMENT SCIENCE, 1991, 37 (12) :1590-1602
[7]   Characterization and generation of a general class of resource-constrained project scheduling problems [J].
Kolisch, R ;
Sprecher, A ;
Drexl, A .
MANAGEMENT SCIENCE, 1995, 41 (10) :1693-1703
[9]   HIERARCHICAL-MODELS FOR MULTIPROJECT PLANNING AND SCHEDULING [J].
SPERANZA, MG ;
VERCELLIS, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) :312-325