A competitive heuristic solution technique for Resource-Constrained Project Scheduling

被引:111
作者
Tormos, P [1 ]
Lova, A [1 ]
机构
[1] Univ Politecn Valencia, Dept Stat & Operat Res, Valencia 46022, Spain
关键词
project management; resource-constrained project scheduling; random sampling; backward-forward;
D O I
10.1023/A:1010997814183
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this work a new heuristic solution technique for the Resource-Constrained Project Scheduling Problem (RCPSP) is proposed. This technique is a hybrid multi-pass method that combines random sampling procedures with a backward-forward method. The impact of each component of the algorithm is evaluated through a step-wise computational analysis which in addition permits the value of their parameters to be specified. Furthermore, the performance of the new technique is evaluated against the best currently available heuristics using a well known set of instances. The results obtained point out that the new technique greatly outperforms both the heuristics and metaheuristics currently available for the RCPSP being thus competitive with the best heuristic solution techniques for this problem.
引用
收藏
页码:65 / 81
页数:17
相关论文
共 49 条
[1]  
[Anonymous], ADV PROJECT SCHEDULI
[2]  
[Anonymous], 1965, CRITICAL PATH METHOD
[3]  
Baar T., 1997, TABU SEARCH ALGORITH
[4]  
BELL CE, 1991, NAV RES LOG, V38, P315, DOI 10.1002/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO
[5]  
2-7
[6]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[7]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[8]  
BOULEIMEN K, 1998, NEW EFFICIENT SIMULA
[9]   THE SCHEDULE-SEQUENCING PROBLEM [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1959, 7 (05) :621-624
[10]  
BRUCKER P, 2000, IN PRESS EUROPEAN J