Steady-state analysis to evaluate the phosphate removal capacity and acetate requirement of biological phosphorus removing mainstream and sidestream process configurations

被引:39
作者
Smolders, GJF [1 ]
vanLoosdrecht, MCM [1 ]
Heijnen, JJ [1 ]
机构
[1] DELFT UNIV TECHNOL,DEPT BIOCHEM ENGN,NL-2628 BC DELFT,NETHERLANDS
关键词
biological phosphorus removal; steady-state analysis; process configurations; phosphate uptake capacity; mainstream process; sidestream process; stripper tank;
D O I
10.1016/S0043-1354(96)00127-3
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A stoichiometric analysis for the evaluation of different process configurations for biological phosphorus removal (BPR) is developed. This analysis is a steady-state simplification of the general dynamic model of biological phosphorus removal developed previously. It provides a simple method to compare the phosphate uptake capacity and acetate requirement of different BPR process configurations like the mainstream and sidestream process. Based on the phosphate concentration in the influent and the system configuration, the minimal required concentration of phosphorus removing organisms (polyP-organisms) in the system, and the maximal phosphate/acetate-COD ratio of the influent to obtain full P-removal can be calculated. The phosphate/acetate-COD ratio of the influent can be used as one of the main parameters in the analysis of a process configuration. The acetate requirement for the sidestream process where P-removal in a stripper tank is applied is shown to be much lower than the requirements needed in a mainstream process. The required concentration of polyP-biomass in a sidestream process is 10 times lower. Copyright (C) 1996 Elsevier Science
引用
收藏
页码:2748 / 2760
页数:13
相关论文
共 15 条
[1]   BIOLOGICAL MECHANISM OF ACETATE UPTAKE MEDIATED BY CARBOHYDRATE CONSUMPTION IN EXCESS PHOSPHORUS REMOVAL SYSTEMS [J].
ARUN, V ;
MINO, T ;
MATSUO, T .
WATER RESEARCH, 1988, 22 (05) :565-570
[2]  
GUJER W, 1994, 3 IAWQ
[3]  
HASCOET MC, 1985, WATER SA, V11, P1
[4]   BIOLOGICAL PHOSPHORUS REMOVAL FROM WASTE-WATER BY ANAEROBIC-ANOXIC SEQUENCING BATCH REACTOR [J].
KUBA, T ;
SMOLDERS, G ;
VANLOOSDRECHT, MCM ;
HEIJNEN, JJ .
WATER SCIENCE AND TECHNOLOGY, 1993, 27 (5-6) :241-252
[5]  
MAUER M, 1994, IAWQ 1M BIENN INT C
[6]  
Metcalf & Eddy Inc., 1972, WAST ENG, P552
[7]   A STRUCTURED METABOLIC MODEL FOR ANAEROBIC AND AEROBIC STOICHIOMETRY AND KINETICS OF THE BIOLOGICAL PHOSPHORUS REMOVAL PROCESS [J].
SMOLDERS, GJF ;
VANDERMEIJ, J ;
VANLOOSDRECHT, MCM ;
HEIJNEN, JJ .
BIOTECHNOLOGY AND BIOENGINEERING, 1995, 47 (03) :277-287
[8]   STOICHIOMETRIC MODEL OF THE AEROBIC METABOLISM OF THE BIOLOGICAL PHOSPHORUS REMOVAL PROCESS [J].
SMOLDERS, GJF ;
VANDERMEIJ, J ;
VANLOOSDRECHT, MCM ;
HEIJNEN, JJ .
BIOTECHNOLOGY AND BIOENGINEERING, 1994, 44 (07) :837-848
[9]   A METABOLIC MODEL OF THE BIOLOGICAL PHOSPHORUS REMOVAL PROCESS .1. EFFECT OF THE SLUDGE RETENTION TIME [J].
SMOLDERS, GJF ;
KLOP, JM ;
VANLOOSDRECHT, MCM ;
HEIJNEN, JJ .
BIOTECHNOLOGY AND BIOENGINEERING, 1995, 48 (03) :222-233
[10]   MODEL OF THE ANAEROBIC METABOLISM OF THE BIOLOGICAL PHOSPHORUS REMOVAL PROCESS - STOICHIOMETRY AND PH INFLUENCE [J].
SMOLDERS, GJF ;
VANDERMEIJ, J ;
VANLOOSDRECHT, MCM ;
HEIJNEN, JJ .
BIOTECHNOLOGY AND BIOENGINEERING, 1994, 43 (06) :461-470