Deriving preference order of open pit mines equipment through MADM methods: Application of modified VIKOR method

被引:88
作者
Bazzazi, Abbas Aghajani [1 ]
Osanloo, Morteza [1 ]
Karimi, Behrooz [2 ]
机构
[1] Amirkabir Univ Technol, Dept Min & Met Engn, Tehran, Iran
[2] Amirkabir Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Multiple attribute decision making; VIKOR; Interval numbers; Mining equipment selection; Fuzzy data; Linguistic terms; MULTICRITERIA ANALYSIS; DECISION; SELECTION;
D O I
10.1016/j.eswa.2010.08.043
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In multiple attribute decision making (MADM) problem, a decision maker (DM) has to choose the best alternative that satisfies the evaluation criteria among a set of candidate solutions. It is generally hard to find an alternative that meets all the criteria simultaneously, so a good compromise solution is preferred. The VIKOR method was developed for multi-criteria optimization of complex systems. This method focuses on ranking and selecting from a set of alternatives in the presence of conflicting criteria. It introduces the multi-criteria ranking index based on the particular measure of "closeness" to the "ideal" solution. To deal with the uncertainty and vagueness from humans' subjective perception and experience in decision process, this paper presents an evaluation model based on deterministic data, fuzzy numbers, interval numbers and linguistic terms. Combination of analytic hierarchy process (AHP) and entropy method was applied for attribute weighting in this proposed MADM method. To demonstrate the potential of the methodology, the proposed method is used for surface mine equipment selection problems. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2550 / 2556
页数:7
相关论文
共 30 条
[1]  
Aghajani A., 2007, 27 INT MIN CONV MEX, P12
[2]  
[Anonymous], INT J SURF MIN RECLA
[3]  
BANDOPADHYAY S, 1987, INT J MIN RECLAM ENV, V1, P59
[4]   An application of the analytic hierarchy process in equipment selection at Orhaneli open pit coal mine [J].
Bascetin, A .
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2004, 113 (03) :192-199
[5]  
Bazzazi AA, 2009, ARCH MIN SCI, V54, P301
[6]   Evaluation of software development projects using a fuzzy multi-criteria decision approach [J].
Buyukozkan, Gulcin ;
Ruan, Da .
MATHEMATICS AND COMPUTERS IN SIMULATION, 2008, 77 (5-6) :464-475
[7]  
Cebesoy T., 1997, INT J SURFACE MINING, V11, P53
[8]  
Celebi N., 1998, International Journal of Surface Mining, Reclamation and Environment, V12, P181, DOI 10.1080/09208118908944042
[9]  
Hall R.A., 2003, INT J SURFACE MINING, V17, P139, DOI [DOI 10.1076/IJSM.17.3.139.14773, 10.1076/ijsm.17.3.139, DOI 10.1076/IJSM.17.3.139]
[10]  
HREBAR MJ, 1990, 2 INT C MIN PLANN EQ, P133