Analysis of the External Pressure on Casings Induced by Salt-Gypsum Creep in Build-up Sections for Horizontal Wells

被引:18
作者
Ge, Weifeng [1 ]
Chen, Mian [1 ]
Jin, Yan [1 ]
Zhang, Fuxiang [2 ]
Lu, Yunhu [1 ]
Yang, Pei [1 ]
Ding, Jihui [1 ]
Zeng, Hao [3 ]
机构
[1] China Univ Petr, State Key Lab Petr Resources & Prospecting, Beijing 102249, Peoples R China
[2] Tarim Oilfield Co CNPC, Petr Engn Res Inst, Korla 841000, Xinjiang, Peoples R China
[3] Univ Tulsa, Tulsa, OK 74104 USA
关键词
Rock salt creep; Build-up section for horizontal well; Borehole curvature; Curved casing; External pressure on casing;
D O I
10.1007/s00603-011-0162-5
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
To alleviate the problems of casing collapse induced by the coupling effect of salt creep movement, as it relates to the curved sections of horizontal wells, an experimental approach was taken to determine the creep (visco-elastic) property of the salt-gypsum formation, using finite-difference software to establish a creep model with curved casing, wellbore and salt formation. With this model, the effects of borehole curvature, drilling direction and casing thickness on external pressure on casing were analyzed, and casing deformation in the non-uniform in situ stress field was simulated. For horizontal wells drilled through salt-gypsum formations, this analysis led to the following conclusions: (1) the casing tends to be much safer when drilling is undertaken along the direction of the minimum horizontal stress; (2) casing deformation occurs and stress increases as the borehole curvature increases; (3) for the same curvature and drilling direction, thicker casings are safer; (4) as the creep time increases, the external pressure on the casing rapidly increases until it reaches its maximum value, whereupon it stays at that value; (5) under the effect of non-uniform in situ stress, a larger non-uniform coefficient would result in greater external pressure on the casing. This model has been successfully applied to analyze the external pressure on curved casings in a build-up section for horizontal wells drilled through salt-gypsum formations in an oilfield in Northwest China. The model has helped to improve the casing design and reduce drilling downtime with greater wellbore stability in salt-gypsum formations.
引用
收藏
页码:711 / 723
页数:13
相关论文
共 24 条
[1]  
Akgun R, 1990, P 8 INT PETR C ANK, P54
[2]  
Alejandro JL, 1997, 38614 SPE
[3]  
Barker JW, 1994, 24605 SPE DRILL COMP
[4]  
[陈沅江 CHEN Yuanjiang], 2008, [北京科技大学学报, Journal of University Science and Technology Beijing], V30, P468
[5]  
Cromb JR, 2000, 59197 IADCSPE
[6]  
Deng Jingen, 1994, PET DRILL TECH, V22, P41
[7]  
Durham WB, 2008, 08387 ARMA
[8]  
Ferda A, 1994, 24613PA SPE DRILL CO
[9]  
Frank JS, 1989, 20150 SPE
[10]  
Han ZY, 1999, PETROLEUM DRILLING T, V27, P15