Exchange rate risk management in international construction ventures

被引:45
作者
Kapila, P [1 ]
Hendrickson, C
机构
[1] ICT Private Ltd, New Delhi, India
[2] Carnegie Mellon Univ, Dept Civil & Environm Engn, Pittsburgh, PA 15208 USA
关键词
D O I
10.1061/(ASCE)0742-597X(2001)17:4(186)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper identifies the financial risk factors associated with international construction ventures from an integrated perspective. It examines the most effective mitigation measures adopted by construction professionals in managing these risks for their construction projects and suggests other means of risk aversion. A case study of forward exchange contracts versus borrowing strategies is presented. The paper is an attempt to present strategies to minimize foreign exchange risk and to better manage foreign exchange dealings.
引用
收藏
页码:186 / 191
页数:6
相关论文
共 5 条
[1]  
AU T, 1983, ENG EC CAPITAL INVES
[2]   Risk management in international construction joint ventures [J].
Bing, L ;
Tiong, RLK ;
Fan, WW ;
Chew, DAS .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (04) :277-284
[3]  
CHRISTOFFERSEN PF, 1998, FRNBY EC POLICY REV
[4]  
Hendrickson C, 2000, PROJECT MANAGEMENT C
[5]  
LOPEZ JA, 1998, FRNBY EC POLICY REV