A comprehensive review of lot streaming

被引:120
作者
Chang, JH
Chiu, HN
机构
[1] Tung Nan Inst Technol, Dept Ind Management, Taipei 222, Taiwan
[2] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
关键词
lot streaming; lot splitting; operations overlapping;
D O I
10.1080/00207540412331325396
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Lot streaming combined lot splitting with operations overlapping is one of the effective techniques used to implement the time-based strategy in today's era of global competition. Therefore, this technique has been studied extensively over the past few decades. In this paper, we first propose a uniquely categorized structure to characterize the existing lot streaming problems in terms of three main dimensions, seven subdimensions, and 17 levels. Then, a notation set is defined to systematically express each existing lot streaming problem by seven ordered elements corresponding to the seven subdimensions. Based on the classification structure and the defined notation set, a comprehensive survey is presented to make up for the lack of a literature review on this subject. The objective is to help the reader gain a clear understanding of the evolution of previous research on lot streaming. This paper concludes with some constructive suggestions for future research directions.
引用
收藏
页码:1515 / 1536
页数:22
相关论文
共 106 条
[1]   THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING [J].
ADAMS, J ;
BALAS, E ;
ZAWACK, D .
MANAGEMENT SCIENCE, 1988, 34 (03) :391-401
[2]  
[Anonymous], PROD INVENTORY MANAG
[3]   Schedule instability, service level and cost in a material requirements planning system [J].
Bai, X ;
Davis, JS ;
Kanet, JJ ;
Cantrell, S ;
Patteson, JW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (07) :1725-1758
[4]   A COMPARATIVE-STUDY OF LOT STREAMING PROCEDURES [J].
BAKER, KR ;
JIA, D .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1993, 21 (05) :561-566
[5]   SOLUTION PROCEDURES FOR THE LOT-STREAMING PROBLEM [J].
BAKER, KR ;
PYKE, DF .
DECISION SCIENCES, 1990, 21 (03) :475-491
[6]   LOT STREAMING IN THE 2-MACHINE FLOW-SHOP WITH SETUP TIMES [J].
BAKER, KR .
ANNALS OF OPERATIONS RESEARCH, 1995, 57 :1-11
[7]   On production batches, transfer batches, and lead times [J].
Benjaafar, S .
IIE TRANSACTIONS, 1996, 28 (05) :357-362
[8]  
Blackburn J. D., 1991, Time-based competition: the next battleground in American manufacturing
[9]   A COMPARISON OF STRATEGIES TO DAMPEN NERVOUSNESS IN MRP SYSTEMS [J].
BLACKBURN, JD ;
KROPP, DH ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1986, 32 (04) :413-429
[10]  
BOCKERSTETTE JA, 1993, TIME BASED MANUFACTU