Evaluation of life-cycle cost analysis practices used by the Michigan Department of Transportation

被引:60
作者
Chan, Arthur [1 ]
Keoleian, Gregory [1 ]
Gabler, Eric [2 ]
机构
[1] Univ Michigan, Sch Nat Resources & Environm, Ctr Sustainable Syst, Ann Arbor, MI 48109 USA
[2] Fed Highway Adm, Washington, DC 20591 USA
关键词
Cost control; Estimation; Government agencies; Life cycles; Michigan; Pavement management; Policies; Road construction;
D O I
10.1061/(ASCE)0733-947X(2008)134:6(236)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Life-cycle cost analysis (LCCA) has become a common practice in road construction at the state level during the past decade in the United States. It enables pavement engineers to conduct a comprehensive assessment of long-term costs, and ideally agency highway funding can be allocated more optimally. Michigan Department of Transportation (MDOT) has adopted LCCA in the pavement selection process since the mid-1980s, yet its application in actual projects has not been reviewed. Using case studies, this paper seeks to analyze MDOT's accuracy in projecting the actual costs over the pavement service life and choosing the lowest-cost pavement alternative. Ten highway sections in Michigan were chosen and grouped into four case studies. Their estimated and actual accumulated costs and maintenance schedules were compared. While results indicate that MDOT LCCA procedure correctly predicts the pavement type with lower initial construction cost, actual costs are usually lower than estimated in the LCCA. This outcome may be partly because the cost estimation module in MDOT's model is not site specific enough. Refinements to its pavement construction and maintenance cost estimating procedures would assist MDOT in realizing the full potential of LCCA in identifying the lowest cost pavement alternatives for the pavements studied.
引用
收藏
页码:236 / 245
页数:10
相关论文
共 25 条
  • [1] *AASHTO, 1986, 1986 GUID DES PAV ST
  • [2] *ASCE, 2005, REP CARD AM INFR
  • [3] *BEA, 2006, TABL 7 1B CURR COST
  • [4] Construction Congestion Cost (CO3) basic model
    Carr, RI
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (02): : 105 - 113
  • [5] CROSS S, 2002, EVALUATION EXPENDITU
  • [6] DELUCCHI M, 1996, UCDITSRR96311
  • [7] Department of Transportation, 2002, IF02047 FHWA US DEP
  • [8] Embacher RA, 2001, TRANSPORT RES REC, P28
  • [9] *EOC, 1985, ENG OP COMM MIN
  • [10] *ERES CONS, 2003, REP PREP OH DOT PAV