Addressing robustness in scheduling batch processes with uncertain operation times

被引:39
作者
Bonfill, A [1 ]
Espuña, A [1 ]
Puigjaner, L [1 ]
机构
[1] Univ Politecn Catalunya, ETSEIB, Dept Chem Engn, E-08028 Barcelona, Spain
关键词
D O I
10.1021/ie049732g
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The uncertainty present in any process environment and related not only to variable market demand but also to operational disturbances is usually unavoidable, and therefore, poor performance may be attained with the execution of deterministic optimal schedules. In this work, the short-term scheduling problem in chemical batch processes with variable processing times is addressed with the aim to identify robust schedules able to face the major effects driving the operation of batch processes with uncertain times, i.e., idle and wait times. The problem is modeled using a two-stage stochastic approach accounting for the minimization of a weighted combination of the expected makespan and the expected wait times. The formulation is extended to explicitly manage risk by optimizing three different robustness criteria. The application of the proposed formulation to academic and industrially based examples shows the efficiency of the proposed approach and highlights the importance of considering the uncertainty in the short-term scheduling level.
引用
收藏
页码:1524 / 1534
页数:11
相关论文
共 23 条
[1]   An MILP Continuous-Time Framework for Short-Term Scheduling of Multipurpose Batch Processes Under Different Operation Strategies [J].
Alberto Mendez, Carlos ;
Cerda, Jaime .
OPTIMIZATION AND ENGINEERING, 2003, 4 (1-2) :7-22
[2]   A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times [J].
Balasubramanian, J ;
Grossmann, IE .
COMPUTERS & CHEMICAL ENGINEERING, 2002, 26 (01) :41-57
[3]  
Bassett MH, 1997, COMPUT CHEM ENG, V21, pS1203
[4]  
Birge J. R., 1997, INTRO STOCHASTIC PRO
[5]   Risk management in the scheduling of batch plants under uncertain market demand [J].
Bonfill, A ;
Bagajewicz, M ;
Espuña, A ;
Puigjaner, L .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2004, 43 (03) :741-750
[6]  
BROOKE A, 1988, GAMS USERS GUDE
[7]   Design and planning under uncertainty: issues on problem formulation and solution [J].
Cheng, L ;
Subrahmanian, E ;
Westerberg, AW .
COMPUTERS & CHEMICAL ENGINEERING, 2003, 27 (06) :781-801
[8]   MINIMIZING THE EFFECTS OF BATCH PROCESS VARIABILITY USING ONLINE SCHEDULE MODIFICATION [J].
COTT, BJ ;
MACCHIETTO, S .
COMPUTERS & CHEMICAL ENGINEERING, 1989, 13 (1-2) :105-113
[9]   ROBUST SCHEDULING TO HEDGE AGAINST PROCESSING TIME UNCERTAINTY IN SINGLE-STAGE PRODUCTION [J].
DANIELS, RL ;
KOUVELIS, P .
MANAGEMENT SCIENCE, 1995, 41 (02) :363-376
[10]  
HERRMANN JW, 1999, C EVOLUTIONARY COMPU