Planning order releases for an assembly system with random operation times

被引:34
作者
Axsäter, S [1 ]
机构
[1] Lund Univ, Dept Ind Management & Logist, S-22100 Lund, Sweden
关键词
multi-stage production/inventory systems; decomposition;
D O I
10.1007/s00291-004-0186-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
A multi-stage assembly network is considered. A number of end items should be delivered at a certain time. Otherwise a delay cost is incurred. End items and components that are delivered before they are needed will cause holding costs. All operation times are independent stochastic variables. The objective is to choose starting times for different operations in order to minimize the total expected costs. We suggest an approximate decomposition technique that is based on repeated application of the solution of a simpler single-stage problem. The performance of our approximate technique is compared to exact results in a numerical study.
引用
收藏
页码:459 / 470
页数:12
相关论文
共 17 条
[1]   SAFETY STOCK VERSUS SAFETY TIME IN MRP CONTROLLED PRODUCTION SYSTEMS [J].
BUZACOTT, JA ;
SHANTHIKUMAR, JG .
MANAGEMENT SCIENCE, 1994, 40 (12) :1678-1689
[2]  
CHEN F, 2001, MANUFACTURING SERVIC, V3, P53
[3]  
CHU CB, 1993, NAV RES LOG, V40, P933, DOI 10.1002/1520-6750(199312)40:7<933::AID-NAV3220400706>3.0.CO
[4]  
2-8
[5]   OPTIMAL POLICIES FOR A MULTI-ECHELON INVENTORY PROBLEM [J].
CLARK, AJ ;
SCARF, H .
MANAGEMENT SCIENCE, 1960, 6 (04) :475-490
[6]   OPTIMAL LEADTIMES PLANNING IN A SERIAL PRODUCTION SYSTEM [J].
GONG, LG ;
DEKOK, T ;
DING, J .
MANAGEMENT SCIENCE, 1994, 40 (05) :629-632
[7]   Customer-order information, leadtimes, and inventories [J].
Hariharan, R ;
Zipkin, P .
MANAGEMENT SCIENCE, 1995, 41 (10) :1599-1607
[8]   SETTING SAFETY LEADTIMES FOR PURCHASED COMPONENTS IN ASSEMBLY SYSTEMS [J].
HOPP, WJ ;
SPEARMAN, ML .
IIE TRANSACTIONS, 1993, 25 (02) :2-11
[9]   Integrating advance order information in make-to-stock production systems [J].
Karaesmen, F ;
Buzacott, JA ;
Dallery, Y .
IIE TRANSACTIONS, 2002, 34 (08) :649-662
[10]   COMPONENT INVENTORY COSTS IN AN ASSEMBLY PROBLEM WITH UNCERTAIN SUPPLIER LEAD-TIMES [J].
KUMAR, A .
IIE TRANSACTIONS, 1989, 21 (02) :112-121