共 32 条
- [1] *ATC, 1983, SEISM RETR GUID HIGH
- [2] Bana E., 2001, J MULTICRITERIA DECI, V10, P111, DOI DOI 10.1002/MCDA.292
- [5] Bana E Costa CA, 2005, INT SER OPER RES MAN, V78, P409, DOI 10.1007/0-387-23081-5_10
- [6] MACBETH [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2012, 11 (02) : 359 - 387
- [7] Basoz N., 1995, Prioritization of bridges for seismic retrofitting
- [8] Basoz N., 1995, P 6 US JAP WORKSH EA, P437
- [9] Belton V., 2002, INTEGRATED APPROACH, DOI [10.1007/978-1-4615-1495-4, DOI 10.1007/978-1-4615-1495-4_9]
- [10] *CML, 2001, PLAN EM PAR RISC SIS