A multi-criterion approach for Kanban allocations

被引:17
作者
Andijani, AA [1 ]
机构
[1] King Fahd Univ Petr & Minerals, Coll Comp Sci & Engn, Dept Syst Engn, Dhahran 31261, Saudi Arabia
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1998年 / 26卷 / 04期
关键词
Kanban allocations; stochastic simulation; serial production systems; MCDM; AHP;
D O I
10.1016/S0305-0483(98)00004-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, a single-item, multi-stage, serial production system is considered. Materials in the system are controlled by Kanban discipline. A fixed total number of Kanbans over a given number of serial workstations is allocated. Three conflicting objectives, the average throughput rate (to be maximized), the average work-in-process (to be minimized), and the average flow time (to be minimized) are considered. Stochastic system simulation is used to generate the efficient set of Kanban allocations. Then the analytic hierarchy process (AHP) is utilized to identify the most-preferred allocation. An illustrative example is given. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:483 / 493
页数:11
相关论文
共 23 条
[1]   BOUNDS FOR THROUGHPUT IN PRODUCTION-INVENTORY SYSTEMS IN SERIES WITH DETERMINISTIC PROCESSING TIMES [J].
ALTIOK, T ;
KAO, ZL .
IIE TRANSACTIONS, 1989, 21 (01) :82-85
[2]  
ANDIJANI AA, 1991, MANUF RES TECHNOL, V12, P175
[3]  
[Anonymous], 1980, ANAL HIERARCHY PROCE
[4]   TESTING MINIMUM PERFORMANCE LEVELS FOR KANBAN-CONTROLLED LINES [J].
BERKLEY, BJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (01) :93-109
[5]   A DECOMPOSITION APPROXIMATION FOR PERIODIC KANBAN-CONTROLLED FLOW SHOPS [J].
BERKLEY, BJ .
DECISION SCIENCES, 1992, 23 (02) :291-311
[6]   SETTING MINIMUM PERFORMANCE LEVELS FOR 2-CARD KANBAN-CONTROLLED LINES [J].
BERKLEY, BJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (05) :1003-1021
[7]   MODELS OF AUTOMATIC TRANSFER LINES WITH INVENTORY BANKS - REVIEW AND COMPARISON [J].
BUZACOTT, JA ;
HANIFIN, LE .
AIIE TRANSACTIONS, 1978, 10 (02) :197-207
[8]  
Corbett C., 1993, P 1993 WINT SIM C, P819
[9]   KANBAN CONTROLLED PULL SYSTEMS - AN ANALYTIC APPROACH [J].
DELEERSNYDER, JL ;
HODGSON, TJ ;
MULLER, H ;
OGRADY, PJ .
MANAGEMENT SCIENCE, 1989, 35 (09) :1079-1091
[10]  
Fishman GS., 1978, PRINCIPLES DISCRETE