Integrated environmental assessment and pollution prevention in Vietnam: the case of anthracite production

被引:21
作者
Chinh, Loi Dinh
Gheewala, Shabbir H.
Bonnet, Sebastien
机构
[1] King Mongkuts Univ Technol Thonburi, Joint Grad Sch Energy & Environm, Bangkok 10140, Thailand
[2] Inst Mining Sci & Technol, Mine Environm Dept, Hanoi, Vietnam
关键词
anthracite production; integrated environmental assessment; life cycle analysis; pollution prevention; Vietnam;
D O I
10.1016/j.jclepro.2006.03.006
中图分类号
X [环境科学、安全科学];
学科分类号
08 [工学]; 0830 [环境科学与工程];
摘要
Using the concept of life cycle analysis, the whole life cycle of anthracite production in Vietnam was assessed and the environmental "hot-spots" were identified. These include (i) dust pollution at coal transfer points or piles in storage; (ii) noise pollution resulting from the usage of heavy equipment, and (iii) high volume of acid and turbid mine water discharged into the environment. Pollution prevention and treatment options were identified and discussed in this study which consists of wet treatment of dust, planning, collection and treatment of mine water, planting of trees for dust and noise reduction as well as minimization of erosion. Some recommendations are made for pollution abatement from coal production and improvement of anthracite production in the region. (C) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1768 / 1777
页数:10
相关论文
共 28 条
[1]
ANNA S, 1999, CONFLICT INTEREST CO
[2]
[Anonymous], [No title captured]
[3]
BACK TS, 1995, SUSTAINABLE DEV COAL
[4]
Clarke, 1996, COAL MINING WATER QU, V44
[5]
DHARMAPPA HB, 2000, J CLEAN PROD, P8
[6]
DINH CL, 2005, JGSEE KYOTO U JOINT, V2, P600
[7]
DINH CL, 2003, VINACOAL B, P80
[8]
*EUR ENV AG, 1997, ENV ISSUE SERIES, V6
[9]
GHEEWALA SH, 2003, INT ENERGY J, V4, P5
[10]
Defining "cleaner production" and "pollution prevention" in the mining context [J].
Hilson, G .
MINERALS ENGINEERING, 2003, 16 (04) :305-321