Choice of nuclear power investments under price uncertainty: Valuing modularity

被引:72
作者
Gollier, C [1 ]
Proult, D [1 ]
Thais, F [1 ]
Walgenwitz, G [1 ]
机构
[1] Univ Toulouse 1, IDEI&LERNA, F-31042 Toulouse, France
关键词
modularity; sequential investment; nuclear equipment; uncertainty; option value;
D O I
10.1016/j.eneco.2005.04.003
中图分类号
F [经济];
学科分类号
02 ;
摘要
This work aims at examining how to compare two investment projects in the electricity market. The first project is a flexible sequence of small nuclear power plants, whereas the second is a nuclear power plant of large capacity. We measure the option value generated by the modularity of the first project, given the uncertain future competitive price of electricity. Using a realistic calibration of the model, we show that the option value of modularity has a sizeable effect on the optimal dynamic strategy of the producer, in particular in terms of the optimal timing of the decision to invest in the first module. (c) 2605 Elsevier B.V. All rights reserved.
引用
收藏
页码:667 / 685
页数:19
相关论文
共 13 条
[1]   ENVIRONMENTAL PRESERVATION, UNCERTAINTY, AND IRREVERSIBILITY [J].
ARROW, KJ ;
FISHER, AC .
QUARTERLY JOURNAL OF ECONOMICS, 1974, 88 (02) :312-319
[2]   A model of sequential investment [J].
Bar-Ilan, A ;
Strange, WC .
JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 1998, 22 (03) :437-463
[3]  
BARRE B, 2001, REV GEN NUCL, P29
[4]   Preemption and rent dissipation under price competition [J].
Boyer, M ;
Lasserre, P ;
Mariotti, T ;
Moreaux, M .
INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 2004, 22 (03) :309-328
[5]  
Dixit A. K., 1999, PROJECT FLEXIBILITY
[6]  
Dixit K., 1994, INVESTMENT UNCERTAIN
[7]   Cycles in competitive electricity markets: a simulation study of the western United States [J].
Ford, A .
ENERGY POLICY, 1999, 27 (11) :637-658
[8]  
Gollier, 2018, EC RISK UNCERTAINTY
[9]  
HENRY C, 1974, AM ECON REV, V64, P1006
[10]   THE VALUE OF WAITING TO INVEST [J].
MCDONALD, R ;
SIEGEL, D .
QUARTERLY JOURNAL OF ECONOMICS, 1986, 101 (04) :707-727