Multiple level production planning in rolling horizon assembly environments

被引:32
作者
Simpson, NC [1 ]
机构
[1] SUNY Buffalo, Dept Management Syst & Sci, Sch Management, Jacobs Management Ctr 325E, Buffalo, NY 14260 USA
关键词
inventory; production; material requirements planning;
D O I
10.1016/S0377-2217(98)00005-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, nine multiple level planning heuristics are evaluated to characterize how rolling horizon results relate to fixed horizon results in a deterministic demand environment. The weighted order cycle (WOC) is introduced as a single expression of cost structure within a multiple item bill of materials. When planning horizons are restated in terms of WOC (versus time buckets), it becomes apparent that the cost performance of the majority of the heuristics is essentially the same for fixed horizon and rolling horizon conditions when the planning horizon is at least two WOC in length. The horizon sensitive logic of the best two heuristics in cost performance also exhibited less nervousness then several horizon myopic rules, a counter intuitive result. An established multiple level cost modification technique was found to reduce the nervousness of single item rules, in addition to its original goal of schedule cost reduction. To gauge cost performance, Lagrangian relaxation of a binary formulation of the problem was used to find bounds within an average of 1% of the optimal solution cost of each simulation. (C) 1999 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:15 / 28
页数:14
相关论文
共 29 条
[1]   COMPUTATIONALLY EFFICIENT OPTIMAL-SOLUTIONS TO THE LOT-SIZING PROBLEM IN MULTISTAGE ASSEMBLY SYSTEMS [J].
AFENTAKIS, P ;
GAVISH, B ;
KARMARKAR, U .
MANAGEMENT SCIENCE, 1984, 30 (02) :222-239
[2]   DETERMINING LOT SIZES AND RESOURCE REQUIREMENTS - A REVIEW [J].
BAHL, HC ;
RITZMAN, LP ;
GUPTA, JND .
OPERATIONS RESEARCH, 1987, 35 (03) :329-345
[3]  
Biggs J.R., 1980, ACAD MANAGE REV, V5, P89, DOI [10.5465/amr.1980.4288917, DOI 10.5465/AMR.1980.4288917]
[4]  
BIGGS JR, 1977, PRODUCTION INVENTORY, V18, P104
[5]  
Blackburn J. D., 1980, Decision Sciences, V11, P691, DOI 10.1111/j.1540-5915.1980.tb01170.x
[6]   A COMPARISON OF STRATEGIES TO DAMPEN NERVOUSNESS IN MRP SYSTEMS [J].
BLACKBURN, JD ;
KROPP, DH ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1986, 32 (04) :413-429
[7]   IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS [J].
BLACKBURN, JD ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1982, 28 (01) :44-56
[8]  
BOOKBINDER JH, 1990, J OPERATIONS MANAGEM, V9, P7, DOI DOI 10.1016/0272-6963(90)90143-2
[9]   AN IMPROVED HEURISTIC FOR MULTILEVEL LOT SIZING IN MATERIAL REQUIREMENTS PLANNING [J].
COLEMAN, BJ ;
MCKNEW, MA .
DECISION SCIENCES, 1991, 22 (01) :136-156
[10]   DYNAMIC LOT SIZE MODELS FOR MULTI-STAGE ASSEMBLY SYSTEMS [J].
CROWSTON, WB ;
WAGNER, MH .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :14-21