Assembly systems layout design model for delayed products differentiation

被引:29
作者
AlGeddawy, Tarek [1 ]
ElMaraghy, Hoda [1 ]
机构
[1] Univ Windsor, IMSC, Windsor, ON N9B 3P4, Canada
关键词
assembly postponement; delayed differentiation; assembly layout design; cladistics; POSTPONEMENT STRATEGIES; MASS CUSTOMIZATION; MANAGEMENT; INVENTORY; FRAMEWORK; EVOLUTION; BENEFITS; COSTS; ORDER;
D O I
10.1080/00207540903117832
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Frequently changing customers' needs and market pressures motivate manufacturers to offer a wide variety of their products. Poor demand prediction and increased manufacturing complexities and managerial burdens are just a few symptoms of products variety proliferation. Applying a postponement strategy is an effective method for mitigating the complexities arising due to increased products variety and customisation. Delayed product differentiation (DPD) is a prerequisite for applying form postponement strategies, where the unique features that distinguish each product are added at the final stages of production. This paper introduces an innovative design methodology to derive and represent an assembly line schematic layout for delayed products differentiation. The proposed methodology incorporates product commonality analysis and feasible assembly sequences to synthesise the assembly line layout in a single integrated logical design framework, without pre-defining either the number or the positions of differentiation points along the line. Products commonality analysis is performed using cladistics techniques commonly used for biological classification. The classical cladistics was modified to take into consideration the precedence constraints, which are required to ensure the feasibility of assembly sequences. Real product variants are used to validate the proposed DPD assembly line layout design methodology and demonstrate its merits.
引用
收藏
页码:5281 / 5305
页数:25
相关论文
共 38 条
[1]   Grouping and selecting products: the design key of Reconfigurable Manufacturing Systems (RMSs) [J].
Abdi, MR ;
Labib, AW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (03) :521-546
[2]   Design for postponement: A comprehensive characterization of its benefits under unknown demand distributions [J].
Aviv, Y ;
Federgruen, A .
OPERATIONS RESEARCH, 2001, 49 (04) :578-598
[3]  
Bragg S., 2004, Inventory Best Practices
[4]   Implementation of delayed differentiation in batch process industries: a standardization problem [J].
Caux, C. ;
David, F. ;
Pierreval, H. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (16) :3243-3255
[5]  
Chen SH, 2006, INT J ADV MANUF TECH, V28, P445, DOI 10.1007/S00170-004-2401-3
[6]  
De Lit P., 2003, Integrated Design of a Product Family and its Assembly System
[7]  
ElMaraghy HA, 2009, SPRINGER SER ADV MAN, P25, DOI 10.1007/978-1-84882-067-8_2
[8]   Modelling evolution in manufacturing: A biological analogy [J].
ElMaraghy, Hoda ;
AlGeddawy, Tarek ;
Azab, Ahmed .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2008, 57 (01) :467-472
[9]   Flexible and reconfigurable manufacturing systems paradigms [J].
ElMaraghy, Hoda A. .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2005, 17 (04) :261-276
[10]  
Emmett S., 2007, Excellence in inventory management: how to minimise costs and maximise service