Policy redesign for solving the financial bottleneck in demand side management (DSM) in China

被引:16
作者
Yu, Yongzhen [1 ]
机构
[1] Harvard Univ, John F Kennedy Sch Govt, Belfer Ctr Sci & Int Affairs, Consortium Energy Policy Program & Energy Technol, Cambridge, MA 02138 USA
关键词
DSM; Funding mechanism; System benefit charge (SBC) policy;
D O I
10.1016/j.enpol.2010.05.067
中图分类号
F [经济];
学科分类号
02 ;
摘要
DSM is one of the best and most practical policy tools for China to balance environmental protection and economic growth. However, the bottleneck lies in the lack of long-term, stable, sufficient and gradually increasing funds to flow into DSM projects. The author redesigns the practical 'system benefit charge (SBC)' policy, which will provide long-term and stable funding for DSM, the policy to facilitate the financial support from banking sector and capital market, and investigates the possibility of DSM funding from CDM projects. SBC is the best way to boost long-term stable and sufficient funding for DSM at present in China. The current low inflation rate and natural resource price are favored to expedite the implementation of SBC and DSM developments. With regard to the uneven development, China needs to design relative policies to offset the impact in different areas, such as tax reduction and fiscal subsides. It is time for China to develop a definite and clear target and timetable to implement DSM, which will give the public and enterprises a definite and clear expectation for the future. The government should publicize a clear and integrated DSM development plan and relative policy outline in the near, medium, and long term. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:6101 / 6110
页数:10
相关论文
共 12 条
  • [1] *ASCUSCR PCGCC, 2009, ROADM US CHIN COOP E
  • [2] BACHRACH D, 2003, EN EFF LEAD CAL PREV
  • [3] CEC, 2005, IMPL CAL LOAD ORD EL
  • [4] Fei Teng, 2008, POSSIBLE DEV TECHNOL
  • [5] Finamore B., 2006, VIS FAC CHIN CENTR P
  • [6] HAN H, 2007, DISCUSSION ADDITIONA, V9
  • [7] Hu Z., 2008, INTEGRATED RESOURCE, p[101, 108, 164, 295]
  • [8] KANDE A, 2008, CALIFORNIA ENERGY CO
  • [9] KOIZUMI S, 2007, LEA INFORM ENERGY EF
  • [10] *SDRC, 2004, MID LONG TERM EN CON