Success factors of energy performance contracting (EPC) for sustainable building energy efficiency retrofit (BEER) of hotel buildings in China

被引:149
作者
Xu, Pengpeng [1 ]
Chan, Edwin Hon-Wan [1 ]
Qian, Queena Kun [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
关键词
Energy performance contracting (EPC); Critical success factor (CSF); Building energy efficiency retrofit; IMPACT;
D O I
10.1016/j.enpol.2011.09.001
中图分类号
F [经济];
学科分类号
02 ;
摘要
Hotel building is a type of high-energy-consuming building and most existing hotel buildings need energy efficiency improvement in China. Energy performance contracting (EPC) is considered a win-win mechanism to organize building energy efficiency retrofit (BEER) project. However, EPC mechanism has been introduced into China relatively recently and many EPCs have not been successful in building energy efficiency retrofit projects. This research aims to develop a set of critical success factors (CSFs) of EPC for sustainable energy efficiency retrofit (BEER) of hotel buildings in China. Semi-structured interviews and a questionnaire survey with practitioners and other professionals were conducted. The findings reveal the relative importance of the 21 number of identified success factors. In order to explore the underlying relationship among the identified critical success factors (CSFs), factor analysis method was adopted for further investigation, which leads to grouping the 21 identified CSFs into six clusters. These are (1) project organization process, (2) EPC project financing for hotel retrofit, (3) knowledge and innovation of EPC, sustainable development (SD), and M&V, (4) implementation of sustainable development strategy, (5) contractual arrangement, and (6) external economic environment. Finally, several relevant policies were proposed to implement EPC successfully in sustainable BEER in hotel buildings. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:7389 / 7398
页数:10
相关论文
共 54 条
[1]  
Alliance to Save Energy, 2006, IMPR EN PERF LOW INC
[2]  
[Anonymous], 1999, Latent Variable Models and Factor Analysis
[3]  
Belassi W., 1996, International Journal of Project Management, V14, P141, DOI [https://doi.org/10.1016/0263-7863(95)00064-X, DOI 10.1016/0263-7863(95)00064-X]
[4]  
Bertoldi P., 2005, 21646EN EUR
[5]  
Chan A. P., 2004, J CONSTRUCTION ENG M, V130
[6]  
Chan A.P.C., 2008, J MANAGEMENT ENG, V24
[7]  
Chan E. H. W., 2005, Management Decision, V43, P589, DOI 10.1108/00251740510593576
[8]  
Chan E. H. W., 2005, International Journal of Project Management, V23, P630, DOI 10.1016/j.ijproman.2005.05.004
[9]  
Chan E.K., 2001, FACILITIES, V19, P261, DOI DOI 10.1108/02632770110390694
[10]   The market for green building in developed Asian cities-the perspectives of building designers [J].
Chan, Edwin H. W. ;
Qian, Queena K. ;
Lam, Patrick T. I. .
ENERGY POLICY, 2009, 37 (08) :3061-3070