Dynamic manufacturing scheduling using both functional and resource related agents

被引:2
作者
Shen, WM [1 ]
Norrie, DH [1 ]
机构
[1] Univ Calgary, Div Mfg Engn, Calgary, AB T2N 1N4, Canada
关键词
D O I
10.3233/ica-2001-8102
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Manufacturing scheduling is a difficult problem, particularly when it takes place in an open and dynamic environment. Agent-based technology has recently been used in attempts to resolve this problem. A bidding mechanism based on Contract Net protocol is often proposed as a key solution component. Our approach is to use both functional and physical resource related agents, and combine a bidding mechanism based on Contract Net protocol with a mediation mechanism based on Mediator architecture for realizing dynamic manufacturing scheduling and rescheduling. A machine-centered scheduling mechanism and related concepts and mechanisms are described, and a prototype implementation is presented.
引用
收藏
页码:17 / 30
页数:14
相关论文
共 37 条
[1]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[2]  
[Anonymous], P AAAI WORKSH CONSTR
[3]  
[Anonymous], INTELLIGENT SCHEDULI
[4]  
BAKER AD, 1991, THESIS RENSSELAER PO
[5]   Multi-agent planning and coordination for distributed concurrent engineering [J].
Balasubramanian, S ;
Maturana, FP ;
Norrie, DH .
INTERNATIONAL JOURNAL OF COOPERATIVE INFORMATION SYSTEMS, 1996, 5 (2-3) :153-179
[6]  
BURKE P, 1994, INTELLIGENT SCHEDULI, P309
[7]  
Butler J., 1992, ARTIF INTELL, P199
[8]  
DUFFIE NA, 1986, J MANUF SYST, V5, P137, DOI 10.1016/0278-6125(86)90036-1
[9]  
Finin T., 1997, SOFTWARE AGENTS, P291
[10]  
GAINES BR, 1995, P 1995 IEEE INT C SY, P964