Unit commitment of single hydroelectric plant

被引:55
作者
Finardi, EC [1 ]
da Silva, EL [1 ]
机构
[1] Univ Fed Santa Catarina, EEL, CTC, Labplant, BR-88040900 Florianopolis, SC, Brazil
关键词
hydroelectric power generation; optimization methods; scheduling; unit commitment;
D O I
10.1016/j.epsr.2005.01.008
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, a model for solving the unit commitment problem of hydroelectric generating units is proposed. This problem results from a more general operating optimization scheme based on decomposition techniques. The developed model uses a target of water amount to be discharged by each hydro plant of the power system. Considering the nonlinearity of the production function of the generating units and the presence of forbidden operative zones, the methodology proposed in this paper defines the optimal commitment of these units. The problem studied can be classified as a nonlinear integer-mixed problem, for which a suitable algorithm based on Branch and Bound and Projected Gradient methods is proposed for its solution. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:116 / 123
页数:8
相关论文
共 18 条
[1]   Optimal dispatch of generating units of the Itaipu hydroelectric plant [J].
Arce, A ;
Ohishi, T ;
Soares, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (01) :154-158
[2]  
BELLONI A, 2001, BUNDL REL PRIM REC U
[3]  
Bertsekas D., 1999, NONLINEAR PROGRAMMIN
[4]  
DASILVA EL, 2003, IEEE T PARALLEL DIST, V14
[5]  
FELTENMARK S, 1997, THESIS ROYAL I TECHN
[6]  
GILLET BE, 1976, MCGRAW HILL SERIES I
[7]  
Guan X, 1999, IEEE T POWER SYST, V14
[8]  
Gulliver JohnS., 1991, HYDROPOWER ENG HDB
[9]  
Lai S, 1999, IEEE T POWER SYST, V14
[10]  
Li CA, 1997, IEEE T POWER SYST, V12