How to measure the benefits of BIM - A case study approach

被引:387
作者
Barlish, Kristen [1 ]
Sullivan, Kenneth [1 ]
机构
[1] Arizona State Univ, Tempe, AZ 85287 USA
关键词
Building Information Modeling (BIM); Benefits of BIM; Framework model; PERFORMANCE;
D O I
10.1016/j.autcon.2012.02.008
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As a term and method that is rapidly gaining popularity, Building Information Modeling (BIM) is under the scrutiny of many building professionals questioning its potential benefits on their projects. A relevant and accepted calculation methodology and baseline to properly evaluate BIM's benefits have not been established, thus there are mixed perspectives and opinions of the benefits of BIM, creating a general misunderstanding of the expected outcomes. The purpose of this paper was to develop a more complete methodology to analyze the benefits of BIM, apply recent projects to this methodology to quantify outcomes, resulting in a more a holistic framework of BIM and its impacts on project efficiency. From the literature, a framework calculation model to determine the value of BIM is developed and presented. The developed model is applied via case studies within a large industrial setting where similar projects are evaluated, some implementing BIM and some with traditional, non-BIM approaches. Cost or investment metrics were considered along with benefit or return metrics. The return metrics were: requests for information, change orders, and duration improvements. The investment metrics were: design and construction costs. The methodology was tested against three separate cases and results on the returns and investments are presented. The findings indicate that in the tool installation department of semiconductor manufacturing, there is a high potential for BIM benefits to be realized. Actual returns and investments will vary with each project. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:149 / 159
页数:11
相关论文
共 38 条
[1]  
Andresen J., 2000, IT CONSTRUCTION I J, V4, P57
[2]  
[Anonymous], THESIS ARIZONA STATE
[3]  
[Anonymous], 2010, What is a BIM?
[4]  
Aranda-Mena G.Crawford., 2008, CIB W78 2008 INT C I
[5]  
Autodesk, BIMS RET INV
[6]  
Bakis N., 2006, 3 INT SCRI S SALF CT
[7]   Performance measurement in construction [J].
Bassioni, HA ;
Price, ADF ;
Hassan, TM .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2004, 20 (02) :42-50
[8]  
Becerik B., 2006, COMPUTER AIDED COLLA
[9]  
Becerik-Gerber B., PERCEIVED VALUE BUIL
[10]   Issues for construction of 300-mm fab [J].
Chasey, AD ;
Merchant, S .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (06) :451-457