New operating strategy for a combined cycle gas turbine power plant

被引:67
作者
Liu, Zuming [1 ]
Karimi, Iftekhar A. [1 ]
机构
[1] Natl Univ Singapore, Dept Chem & Biomol Engn, 4 Engn Dr 4, Singapore 117585, Singapore
关键词
Simulation; Gas turbine; Combined cycle; Part-load operation; Operating strategy; POSTCOMBUSTION CO2 CAPTURE; OFF-DESIGN PERFORMANCE; PART LOAD PERFORMANCE; OPTIMIZATION; RECIRCULATION;
D O I
10.1016/j.enconman.2018.06.110
中图分类号
O414.1 [热力学];
学科分类号
摘要
The highly dynamic nature of power demand forces a combined cycle gas turbine (CCGT) power plant to often run at less-efficient part-load conditions. A new operating strategy called EGR-IGVC is proposed in this work to improve the part-load performance of a CCGT plant. The strategy partially recycles the flue gas from the heat recovery steam generator and manipulates the inlet guide vanes to regulate part-load operation and boost plant efficiency. It allows the CCGT plant to set its own acceptable gas turbine temperature limits at any time and thus maximize the plant performance. Our previous CCGT flow diagram in Aspen HYSYS [Liu and Karimi (2018)] is modified to accommodate EGR for evaluating EGR-IGVC. Then, using a case study CCGT plant, EGR-IGVC is compared in detail with the conventional inlet guide vane control (IGVC). The results show that EGR-IGVC improves the plant part-load performance significantly. It increases the plant efficiency by up to 1.2% (actual) and reduces the CO2 emissions by up to 13.8 kg MW-1 h(-1). By enabling an effective utilization of low-temperature waste heat and reducing the propensity for NO formation, EGR-IGVC promises to be a better strategy for the part-load operation of CCGT plants.
引用
收藏
页码:1675 / 1684
页数:10
相关论文
共 35 条
[1]   Off-design point modelling of a 420 MW CCGT power plant integrated with an amine-based post-combustion CO2 capture and compression process [J].
Adams, T. ;
Mac Dowell, N. .
APPLIED ENERGY, 2016, 178 :681-702
[2]   Thermodynamic analysis and thermoeconomic optimization of a dual pressure combined cycle power plant with a supplementary firing unit [J].
Ahmadi, Pouria ;
Dincer, Ibrahim .
ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (05) :2296-2308
[3]   Performance evaluation of PACT Pilot-plant for CO2 capture from gas turbines with Exhaust Gas Recycle [J].
Akram, M. ;
Ali, U. ;
Best, T. ;
Blakey, S. ;
Finney, K. N. ;
Pourkashanian, M. .
INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2016, 47 :137-150
[4]  
[Anonymous], 1999, COMBINED CYCLE GAS
[5]   Supercharged gas turbine combined cycle: An improvement in plant flexibility and efficiency [J].
Barelli, Linda ;
Ottaviano, Andrea .
ENERGY, 2015, 81 :615-626
[6]   The impact of variable demand upon the performance of a combined cycle gas turbine (CCGT) power plant [J].
Bass, Robert J. ;
Malalasekera, Weeratunge ;
Willmot, Peter ;
Versteeg, Henk K. .
ENERGY, 2011, 36 (04) :1956-1965
[7]   Evaluation of natural gas combined cycle power plant for post-combustion CO2 capture integration [J].
Biliyok, Chechet ;
Yeung, Hoi .
INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2013, 19 :396-405
[8]   Sensitivity analysis of exergy destruction in a real combined cycle power plant based on advanced exergy method [J].
Boyaghchi, Fateme Ahmadi ;
Molaie, Hanieh .
ENERGY CONVERSION AND MANAGEMENT, 2015, 99 :374-386
[9]   Study of an exhaust gas recirculation equipped micro gas turbine supplied with bio-fuels [J].
Cameretti, Maria Cristina ;
Tuccillo, Raffaele ;
Piazzesi, Renzo .
APPLIED THERMAL ENGINEERING, 2013, 59 (1-2) :162-173
[10]   CFD analysis of exhaust gas recirculation in a micro gas turbine combustor for CO2 capture [J].
De Santis, Andrea ;
Ingham, Derek B. ;
Ma, Lin ;
Pourkashanian, Mohamed .
FUEL, 2016, 173 :146-154