Measurement and numerical modelling of the process of tunnelling

被引:17
作者
Benmebarek, S
Kastner, R
Ollier, C
Charif, A
机构
[1] INSA, URGC Geotech, Lyon, France
[2] Univ Batna, Batna, Algeria
来源
GEOTECHNIQUE | 1998年 / 48卷 / 06期
关键词
case history; grouting; monitoring; numerical modelling and analysis; settlement; tunnels;
D O I
10.1680/geot.1998.48.6.801
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In order to obtain a precise and reliable measurement database for the validation and qualification of simulation tools describing the deformations induced by tunnelling operations, two sites on the Lyon Metro D line extension have been intensively monitored. This paper presents the results of measurements from two experimental transverse tunnel sections of this line, A comparison with data from previous projects shows that the instability of the tunnel face and the annular void created by the passage of the shield constitute the principal sources of short-term settlement. Based on these measurements, a new procedure of numerical simulation in the plane strain conditions is proposed, taking into account various stages of construction. The comparison of the observed and simulated movements shows that the behaviour of soft ground is better simulated by displacement control than by stress control of the periphery of the excavation.
引用
收藏
页码:801 / 818
页数:18
相关论文
共 27 条
[1]  
Attewell P.B., 1977, P LARG GROUND MOV ST
[2]  
Bakker KJ, 1996, GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, P459
[3]  
Bernat S, 1996, GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, P465
[4]  
BORST R, 1996, GEOTECHNICAL ASPECTS, P497
[5]  
Clough G.W., 1985, 5 INT C NUM METH GEO, P1167
[6]   EPB SHIELD TUNNELING IN MIXED FACE CONDITIONS [J].
CLOUGH, GW ;
LECA, E .
JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1993, 119 (10) :1640-1656
[7]  
Clough GW., 1981, SOFT CLAY ENG
[8]  
FUJITA K, 1993, JSSMFE, P53
[9]  
GENVEY GA, 1977, J USSR STRUCT MECH C, V3
[10]  
HIRATA T, 1983, OBSERVATION GROUND M, P11