Strengthening the evaluation of programme effectiveness through reconstructing baseline data

被引:14
作者
Bamberger, Michael
机构
关键词
impact evaluation; aid effectiveness; monitoring; result-based management; effects assessment; baseline; milestones; performance; POVERTY; GROWTH; HEALTH; POOR;
D O I
10.1080/19439340902727610
中图分类号
F0 [经济学]; F1 [世界各国经济概况、经济史、经济地理]; C [社会科学总论];
学科分类号
0201 ; 020105 ; 03 ; 0303 ;
摘要
Project monitoring, impact evaluation, results-based management and effects assessment are all based on the comparison of observed changes in the project population with the situation prior to the launch of the project. However, a significant proportion of each of these types of estimation has to be made without access to baseline data on the project or control groups. This paper examines some of the reasons for this widespread lack of baseline data and describes and illustrates a range of techniques that can be used for the 'reconstruction' of baseline data.
引用
收藏
页码:37 / 59
页数:23
相关论文
共 39 条
[1]  
[Anonymous], 2007, EV RES BAS MAN UNDP
[2]  
[Anonymous], MAN DEV RES PRINC AC
[3]  
[Anonymous], WORLD BANK EC REV
[4]  
[Anonymous], UN HDB POVERTY STAT
[5]  
[Anonymous], CHECKLIST ASSESSING
[6]  
[Anonymous], HDB POV STAT
[7]  
[Anonymous], DESIGNING HOUSE HOLD
[8]  
[Anonymous], WHAT CONST STRONG EV
[9]  
[Anonymous], ASSESSING GENDER IMP
[10]  
[Anonymous], 2002, HDB MON EV RES