Benchmarks for scheduling on a single machine against restrictive and unrestrictive common due dates

被引:79
作者
Biskup, D [1 ]
Feldmann, M [1 ]
机构
[1] Univ Bielefeld, Fac Econ & Business Adm, D-33501 Bielefeld, Germany
关键词
scheduling; common due date; benchmark;
D O I
10.1016/S0305-0548(00)00008-3
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We consider the NP-hard problem of scheduling jobs on a single machine against common due dates with respect to earliness and tardiness penalties. The paper covers two aspects: Firstly, we develop a problem generator and solve 280 instances with two new heuristics to obtain upper bounds on the optimal objective function value, Secondly, we demonstrate computationally that our heuristics are efficient in obtaining near-optimal solutions for small problem instances. The generated problem instances in combination with the upper bounds can be used as benchmarks for future approaches in the field of common due-date scheduling.
引用
收藏
页码:787 / 801
页数:15
相关论文
共 22 条
[1]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[2]  
CHENG TCE, 1991, NAV RES LOG, V38, P715, DOI 10.1002/1520-6750(199110)38:5<715::AID-NAV3220380506>3.0.CO
[3]  
2-6
[4]   SOLVING A GENERALIZED-MODEL FOR CON DUE-DATE ASSIGNMENT AND SEQUENCING [J].
DE, P ;
GHOSH, JB ;
WELLS, CE .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 34 (02) :179-185
[5]   COMMON DUE DATE SCHEDULING PROBLEM WITH SEPARATE EARLINESS AND TARDINESS PENALTIES [J].
DILEEPAN, P .
COMPUTERS & OPERATIONS RESEARCH, 1993, 20 (02) :179-184
[6]  
FELDMANN M, 1999, 425 U BIEL
[7]   EARLINESS-TARDINESS SCHEDULING PROBLEMS .2. DEVIATION OF COMPLETION TIMES ABOUT A RESTRICTIVE COMMON DUE DATE [J].
HALL, NG ;
KUBIAK, W ;
SETHI, SP .
OPERATIONS RESEARCH, 1991, 39 (05) :847-856
[8]   EARLINESS-TARDINESS SCHEDULING PROBLEMS .1. WEIGHTED DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE [J].
HALL, NG ;
POSNER, ME .
OPERATIONS RESEARCH, 1991, 39 (05) :836-846
[9]   SCHEDULING AROUND A SMALL COMMON DUE DATE [J].
HOOGEVEEN, JA ;
VANDEVELDE, SL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 55 (02) :237-242
[10]   Using tabu search to solve the common due date early/tardy machine scheduling problem [J].
James, RJW .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (03) :199-208