Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time

被引:23
作者
Cai, XQ [1 ]
Sun, XQ
Zhou, X
机构
[1] Chinese Univ Hong Kong, Dept Syst Engn & Engn Management, Shatin, Hong Kong, Peoples R China
[2] Huaiyin Teachers Coll, Dept Math, Huaian 223001, Jiangsu Prov, Peoples R China
[3] Hong Kong Polytech Univ, Dept Appl Math, Kowloon, Hong Kong, Peoples R China
关键词
D O I
10.1017/S0269964803174037
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study a stochastic scheduling problem with a single machine subject to random breakdowns. We address the preemptive-repeat model; that is, if a breakdown occurs during the processing of a job, the work done on this job is completely lost and the job has to be processed from the beginning when the machine resumes its work. The objective is to complete all jobs so that the the expected weighted flow time is minimized. Limited results have been published in the literature on this problem, all with the assumption that the machine uptimes are exponentially distributed. This article generalizes the study to allow that (1) the uptimes and downtimes of the machine follow general probability distributions, (2) the breakdown patterns of the machine may be affected by the job being processed and are thus job dependent; (3) the processing times of the jobs are random variables following arbitrary distributions, and (4) after a breakdown, the processing time of a job may either remain a same but unknown amount, or be resampled according to its probability distribution. We derive the necessary and sufficient condition that ensures the problem with the flow-time criterion to be well posed under the preemptive-repeat breakdown model. We then develop an index policy that is optimal for the problem. Several important situations are further considered and their optimal solutions are obtained.
引用
收藏
页码:467 / 485
页数:19
相关论文
共 14 条
[1]  
ADIRI I, 1991, NAV RES LOG, V38, P261, DOI 10.1002/1520-6750(199104)38:2<261::AID-NAV3220380210>3.0.CO
[2]  
2-I
[3]  
BIRGE J, 1990, NAV RES LOG, V37, P661, DOI 10.1002/1520-6750(199010)37:5<661::AID-NAV3220370506>3.0.CO
[4]  
2-3
[5]   Stochastic scheduling on parallel machines subject to random breakdowns to minimize expected costs for earliness and tardy jobs [J].
Cai, XQ ;
Zhou, S .
OPERATIONS RESEARCH, 1999, 47 (03) :422-437
[6]   Asymmetric earliness and tardiness scheduling with exponential processing times on an unreliable machine [J].
Cai, XQ ;
Zhou, X .
ANNALS OF OPERATIONS RESEARCH, 2000, 98 (1-4) :313-331
[7]  
Frostig E, 1991, Probability in the Engineering and Information Sciences, V5, P349, DOI 10.1017/S0269964800002138
[8]   SCHEDULING STOCHASTIC JOBS ON A SINGLE-MACHINE SUBJECT TO BREAKDOWNS [J].
GLAZEBROOK, KD .
NAVAL RESEARCH LOGISTICS, 1984, 31 (02) :251-264
[9]  
GLAZEBROOK KD, 1987, NAV RES LOG, V34, P319, DOI 10.1002/1520-6750(198706)34:3<319::AID-NAV3220340303>3.0.CO
[10]  
2-5