Requirements engineering as a success factor in software projects

被引:219
作者
Hofmann, HF [1 ]
Lehner, F [1 ]
机构
[1] Univ Regensburg, D-93040 Regensburg, Germany
关键词
D O I
10.1109/MS.2001.936219
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Defficient requirements are the single biggest cause of software project failure. From studying several hundred organizations, Gapers Jones discovered that RE is deficient in more than 75 percent of all enterprises,(1) In other words, getting requirements right might be the single most important and difficult part of a software project. Despite its importance, we know surprisingly little about the actual process of specifying software. "The RE Process" sidebar provides a basic description.
引用
收藏
页码:58 / +
页数:10
相关论文
共 12 条
[1]  
[Anonymous], 1 IEEE INT S REQ ENG
[2]  
[Anonymous], APPL SOFTWARE MEASUR
[3]  
Boehm B. W., 1981, SOFTWARE ENG EC
[4]   Factors affecting completion of the requirements capture stage of projects with different characteristics [J].
Chatzoglou, PD .
INFORMATION AND SOFTWARE TECHNOLOGY, 1997, 39 (09) :627-640
[5]   A FIELD-STUDY OF THE SOFTWARE-DESIGN PROCESS FOR LARGE SYSTEMS [J].
CURTIS, B ;
KRASNER, H ;
ISCOE, N .
COMMUNICATIONS OF THE ACM, 1988, 31 (11) :1268-1287
[6]   The consideration of organizational issues during the systems development process: an empirical analysis [J].
Doherty, NF ;
King, M .
BEHAVIOUR & INFORMATION TECHNOLOGY, 1998, 17 (01) :41-51
[7]  
EMAM KE, 1995, 2 INT S REQ ENG LOS, P68
[8]   Enabling software development team performance during requirements definition: A behavioral versus technical approach [J].
Guinan, PJ ;
Cooprider, JG ;
Faraj, S .
INFORMATION SYSTEMS RESEARCH, 1998, 9 (02) :101-125
[9]  
HOFMANN HF, 2000, REQUIREMENTS ENG SIT
[10]  
IEEE, 1998, 8301998 IEEE