A maintenance model with opportunities and interrupt replacement options

被引:10
作者
Dagpunar, JS
机构
关键词
maintenance; repair; replacement;
D O I
10.2307/3010206
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A component has time to failure X with density f(.). Opportunities arise as a Poisson process of rate lambda. At an opportunity the component may at choice, be replaced at cost ct. At failure the components can either be minimally repaired at cost c(1) or replaced at cost c(4). Finally the component may be replaced at any time at an 'interrupt' cost of c(3). We derive expressions for the long-ran expected cast rate, and give examples of numerical optimisation with respect to control limits on age at an opportunity, and at an interrupt replacement.
引用
收藏
页码:1406 / 1409
页数:4
相关论文
共 14 条
[1]   OPTIMUM PREVENTIVE MAINTENANCE POLICIES [J].
BARLOW, R ;
HUNTER, L .
OPERATIONS RESEARCH, 1960, 8 (01) :90-100
[2]  
Barlow RE, 1965, MATH THEORY RELIABIL
[3]  
DAGPUNAR JS, 1994, P ISSAT C REL QUAL D, P235
[4]   OPPORTUNITY-BASED BLOCK REPLACEMENT [J].
DEKKER, R ;
SMEITINK, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 53 (01) :46-63
[5]  
DEKKER R, 1992, NAV RES LOG, V39, P175, DOI 10.1002/1520-6750(199203)39:2<175::AID-NAV3220390204>3.0.CO
[6]  
2-Y
[7]  
DUNCAN J, 1978, OPL RES Q, V24, P271
[8]   PREVENTIVE REPLACEMENT FOR MULTICOMPONENT SYSTEMS - AN OPPORTUNISTIC DISCRETE-TIME DYNAMIC-PROGRAMMING MODEL [J].
LECUYER, P ;
HAURIE, A .
IEEE TRANSACTIONS ON RELIABILITY, 1983, 32 (01) :117-118
[9]  
LECUYER P, 1987, OPTIM CONTR APPL MET, V8, P219, DOI 10.1002/oca.4660080304
[10]  
Morse P. M., 1958, Queues, inventories, and maintenance