Predicting performance of design-build and design-bid-build projects

被引:150
作者
Ling, FYY [1 ]
Chan, SL [1 ]
Chong, E [1 ]
Ee, LP [1 ]
机构
[1] Natl Univ Singapore, Dept Bldg, Singapore 117566, Singapore
关键词
performance evaluation; design/build; project management; models;
D O I
10.1061/(ASCE)0733-9364(2004)130:1(75)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Design-build (DB) and design-bid-build (DBB) are two principal project delivery systems used in many countries. This paper reports on models constructed to predict performance of DB and DBB projects on 11 areas, using project-specific data collected from 87 building projects. The study included collecting, checking, and validating industry data, and the statistical development of multivariate linear regression models for predicting project performance. Robust models are developed to predict construction and delivery speeds of DB and DBB projects. Gross floor area of the project is the most significant factor affecting speed. Besides this, for DBB projects, contractors' design ability, and adequacy of plant and equipment would ensure speedy completion of the projects. For DB projects, if the contract period is allowed to vary during tender evaluation, this would slow down the project. Robust models to predict turnover and system quality of DB projects are also constructed. A DB contractor's track record is an important variable. They must have completed past projects to acceptable quality and have ability in financial, health and safety management.
引用
收藏
页码:75 / 83
页数:9
相关论文
共 12 条
[1]  
[Anonymous], 1991, DESIGN BUILD EXPLAIN
[2]  
[Anonymous], 1996, DESIGNING BUILDING W
[3]  
*BCA, 2002, SING BUILD CONSTR AU
[4]   Design and build project success factors: Multivariate analysis [J].
Chan, APC ;
Ho, DCK ;
Tam, CM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2001, 127 (02) :93-100
[5]  
Hammersley Martyn., 1983, ETHNOGRAPHY PRINCIPL
[6]  
KAMING PF, 1997, CONSTR MANAGE EC, V15, P82
[7]   Comparison of US project delivery systems [J].
Konchar, M ;
Sanvido, V .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (06) :435-444
[8]  
Kumaraswamy M. M., 1995, CONSTRUCTION MANAGEM, V13, P209, DOI [10.1080/01446199500000025, DOI 10.1080/01446199500000025]
[9]  
Mohsini R.A., 1992, CONSTRUCTION MANAGEM, V10, P343, DOI DOI 10.1080/01446199200000030
[10]   Model for public sector design-build project selection [J].
Molenaar, KR ;
Songer, AD .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1998, 124 (06) :467-479