A method for transmission system expansion planning considering probabilistic reliability criteria

被引:146
作者
Choi, J [1 ]
Tran, T
El-Keib, ARA
Thomas, R
Oh, S
Billinton, R
机构
[1] Gyeongsang Natl Univ, Dept Elect Engn, Chinju 660701, South Korea
[2] Petr Inst, Dept Elect Engn, Abu Dhabi 2533, U Arab Emirates
[3] Cornell Univ, Dept Elect & Comp Engn, Ithaca, NY 14853 USA
[4] Univ Saskatchewan, Dept Elect Engn, Saskatoon, SK S7N 5A9, Canada
关键词
branch and bound; probabilistic reliability criteria; transmission system planning;
D O I
10.1109/TPWRS.2005.852142
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a method for choosing the best transmission system expansion plan considering a probabilistic reliability criterion (RLOLE). The method minimizes the investment budget for constructing new transmission lines subject to probabilistic reliability criteria, which consider the uncertainties of transmission system elements. Two probabilistic reliability criteria are used as constraints. One is a transmission system reliability criterion (RLOLETS) constraint, and the other is a bus/nodal reliability criterion (RLOLEBus) constraint. The proposed method models the transmission system expansion problem as an integer programming problem. It solves for the optimal strategy using a probabilistic branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Test results on an existing 21-bus system are included in the paper. They demonstrate the suitability of the proposed method for solving the transmission system expansion planning problem subject to practical future uncertainties.
引用
收藏
页码:1606 / 1615
页数:10