Queueing models for full-flexible multi-class call centers with real-time anticipated delays

被引:54
作者
Jouini, Oualid [1 ,2 ]
Dallery, Yves [3 ]
Aksin, Zeynep [4 ]
机构
[1] Ecole Cent Paris, Lab Genie Ind, F-92290 Chatenay Malabry, France
[2] Grp ESC Rouen, F-76136 Mont St Aignan, France
[3] Ecole Cent Paris, Dept Ind Engn, F-92290 Chatenay Malabry, France
[4] Koc Univ, Coll Adm Sci & Econ, TR-34450 Istanbul, Turkey
关键词
Call centers; Predicting delays; Announcing delays; Impatient customers; Markov chains; Multi-server queues; SERVICE; APPROXIMATION; CUSTOMERS; QUEUES;
D O I
10.1016/j.ijpe.2008.01.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we consider two basic multi-class call center models, with and without reneging. Customer classes have different priorities. The content of different types of calls is assumed to be similar allowing their service times to be identical. We study the problem of announcing delays to customers upon their arrival. For the simplest model without reneging, we give a method to estimate virtual delays that is used within the announcement step. For the second model, we first build the call center model incorporating reneging. The model takes into account the change in customer behavior that may occur when delay information is communicated to them. In particular, it is assumed that customer reneging is replaced by balking that depends on the state of the system in this case. We develop a method based on Markov chains in order to estimate virtual delays of new arrivals for this model. Finally, some practical issues concerning delay announcement are discussed. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:389 / 399
页数:11
相关论文
共 31 条
[1]  
Aksin O.Z., 2002, DESIGNING FLEXIBILIT
[2]  
Ancker Jr C.J., 1962, J IND ENG, V13, P84
[3]   Contact centers with a call-back option and real-time delay information [J].
Armony, M ;
Maglaras, C .
OPERATIONS RESEARCH, 2004, 52 (04) :527-545
[4]  
ARMONY M, 2008, OPERATIONS IN PRESS, DOI DOI 10.1287/OPRE.1080.0533
[5]   Performance evaluation, planning and control, of productive systems [J].
Artiba, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 85 (01) :1-2
[6]  
Baccelli F., 1981, Performance '81. Proceedings of the 8th International Symposium on Computer Performance Modelling, Measurement and Evaluation, P159
[7]   Asymptotic results and a Markovian approximation for the M(n)/M(n)/s plus GI system [J].
Brandt, A ;
Brandt, M .
QUEUEING SYSTEMS, 2002, 41 (1-2) :73-94
[8]   Overflow analysis and cross-trained servers [J].
Chevalier, P ;
Tabordon, N .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 85 (01) :47-60
[9]  
Gans N., 2003, Manufacturing Service Operations Management, V5, P73
[10]  
Garnett O., 2002, Manufacturing & Service Operations Management, V4, P208, DOI 10.1287/msom.4.3.208.7753