Demand side resource operation on the Irish power system with high wind power penetration

被引:69
作者
Keane, A. [1 ]
Tuohy, A. [1 ]
Meibom, P. [3 ]
Denny, E. [2 ]
Flynn, D. [1 ]
Mullane, A. [4 ]
O'Malley, M. [1 ]
机构
[1] Univ Coll Dublin, Sch Elect Elect & Mech Engn, Dublin 4, Ireland
[2] Trinity Coll Dublin, Dublin, Ireland
[3] Tech Univ Denmark, RISO DTU, Lyngby, Denmark
[4] ECAR Energy Ltd, Dublin, Ireland
基金
爱尔兰科学基金会;
关键词
Demand side resources; Wind power; Power system operation;
D O I
10.1016/j.enpol.2011.02.071
中图分类号
F [经济];
学科分类号
02 ;
摘要
The utilisation of demand side resources is set to increase over the coming years with the advent of advanced metering infrastructure, home area networks and the promotion of increased energy efficiency. Demand side resources are proposed as an energy resource that, through aggregation, can form part of the power system plant mix and contribute to the flexible operation of a power system. A model for demand side resources is proposed here that captures its key characteristics for commitment and dispatch calculations. The model is tested on the all island Irish power system, and the operation of the model is simulated over one year in both a stochastic and deterministic mode, to illustrate the impact of wind and load uncertainty. The results illustrate that demand side resources can contribute to the efficient, flexible operation of systems with high penetrations of wind by replacing some of the functions of conventional peaking plant. Demand side resources are also shown to be capable of improving the reliability of the system, with reserve capability identified as a key requirement in this respect. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2925 / 2934
页数:10
相关论文
共 26 条
[1]  
*AIGS, 2006, AIGS ALL ISL GRID ST
[2]  
*AIP, 2005, ALL ISL PROJ AIP ALL
[3]  
*ALL ISL GRID STUD, 2006, HIGH LEV ASS SUIT GE
[4]  
[Anonymous], DEM SID MAN IR EV EN
[5]  
[Anonymous], 2003, ORNLTM200319
[6]  
[Anonymous], SCOP STUD DEM SID ME
[7]  
BARTH R, 2006, DELIVERABLE D6 2 DOC
[8]  
BARTH R, 2006, 9 INT C PROB METH AP
[9]  
Billinton R., 1994, RELIABILITY EVALUATI, DOI DOI 10.1007/978-1-4615-7731-7
[10]  
*CER UT REG, 2010, SINGL EL MARK DEM SI