Six oil spill booms produced by five manufacturers for use as fire resistant booms, were tested at the Minerals Management Service's Ohmsett Facility, NWS-Earle, Leonardo, New Jersey. The tests were conducted between July 16, 1996 and October 4, 1996. Prior to being exposed to any fire, the booms were tested for: first loss tow speed, loss rate, critical tow speed, and wave conformance. No fires were used during these tests. Four of the booms performed within speed and rate loss ranges that have been measured for commercial non-fire resistant booms. One boom was found to be superior in wave conformance and critical tow speed. However, this boom was at the lower edge of the range for first loss tow speed. A prototype boom, with a unique paddle wheel operating principal was the sixth boom included in the study. This boom was found to need further development. (C) 2001 Published by Elsevier Science Ltd.