摘要
An erosion estimation technique was developed in this study based on turbidity and sediment sampling data in a small catchment in South Australia. Several data sets, derived from the time sequence in which the data were collected, were used to develop a number of turbidity and suspended sediment relationships. These relationships were then used to estimate erosion from the catchment. The variability in sediment load estimation using different relationships, and how these relationships impacted on load estimation, were analyzed in detail. The study estimates erosion on a storm basis using detailed sediment sampling and turbidity data. Storm sediment loads were then accumulated to derive annual load, which distinguishes this study from volume based sediment studies. The study found that large storms dominate erosion in the catchment, and erosion rate depends more on peak storm flow than other hydrological variables. A relatively low annual erosion rate from the catchment was found, which is consistent with studies in other Australian catchments. The study found that, to establish a sound relationship between suspended sediment and turbidity for a catchment, it requires extensive data collection of large as well as small storms at short time intervals, a storm-based erosion estimation approach, and a data set that is used for interpolation rather than extrapolation. Erosion estimation based on infrequent, non-storm based or extrapolated data is exposed to potentially large errors, and the results may only be relied upon as a general guide rather than serious estimation of catchment erosion. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:227 / 238
页数:12
相关论文
共 19 条
[1]  
Banasik K, 1996, NORD HYDROL, V27, P275
[2]  
BRABBEN TE, 1980, 22 OD HYDR RES STAT
[3]  
EDWARDS K, 1987, MACQUARIE U TECHNICA, V10
[4]  
EKERN PC, 1977, NAT C SOIL ER MAY 24, P342
[5]   AN EVALUATION OF THE USE OF SUSPENDED SEDIMENT RATING CURVES FOR THE PREDICTION OF SUSPENDED SEDIMENT CONCENTRATION IN A PROGLACIAL STREAM [J].
FENN, CR ;
GURNELL, AM ;
BEECROFT, IR .
GEOGRAFISKA ANNALER SERIES A-PHYSICAL GEOGRAPHY, 1985, 67 (1-2) :71-82
[6]   FIELD CALIBRATION OF A RECORDING TURBIDITY METER [J].
FINLAYSON, BL .
CATENA, 1985, 12 (2-3) :141-147
[7]  
GEARY PM, 1981, AUSTR REPRESENTATIVE
[8]  
GIPPEL CJ, 1989, MONOGRAPH SERIES U N, V4
[9]  
Hodson A, 1998, HYDROL PROCESS, V12, P73, DOI 10.1002/(SICI)1099-1085(199801)12:1<73::AID-HYP564>3.3.CO
[10]  
2-J