A two-stage programming approach for water resources management under randomness and fuzziness

被引:60
作者
Guo, P. [2 ]
Huang, G. H. [1 ,4 ]
Zhu, H. [1 ]
Wang, X. L. [3 ]
机构
[1] Univ Regina, Environm Syst Engn Program, Regina, SK S4S 0A2, Canada
[2] China Agr Univ, Coll Water Conservancy & Civil Engn, Beijing 100083, Peoples R China
[3] Tianjin Univ, Sch Civil Engn, Tianjin 300072, Peoples R China
[4] N China Elect Power Univ, Beijing 102206, Peoples R China
关键词
Chance-constrained programming; Decision making; Fuzzy random variable; Fuzzy robust programming; Two-stage programming; Uncertainty; Water resources; SOLID-WASTE MANAGEMENT; FUZZY RANDOM-VARIABLES; CLIMATE-CHANGE; OPTIMIZATION; ALGORITHMS; ROBUSTNESS; OPERATIONS; MODEL;
D O I
10.1016/j.envsoft.2010.04.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this study, a fuzzy stochastic two-stage programming (FSTP) approach is developed for water resources management under uncertainty. The concept of fuzzy random variable expressed as parameters' uncertainties with both stochastic and fuzzy characteristics was used in the method. FSTP has advantages in uncertainty reflection and policy analysis. FSTP integrates the fuzzy robust programming, chance-constrained programming and two-stage stochastic programming (TSP) within a general optimization framework. FSTP can incorporate pre-regulated water resources management policies directly into its optimization process. Thus, various policy scenarios with different economic penalties (when the promised amounts are not delivered) can be analyzed. FSTP is applied to a water resources management system with three users. The results indicate that reasonable solutions were generated, thus a number of decision alternatives can be generated under different levels of stream flows, a-cut levels and different levels of constraint-violation probability. The developed FSTP was also compared with TSP to exhibit its advantages in dealing with multiple forms of uncertainties. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1573 / 1581
页数:9
相关论文
共 47 条
[1]   A finite branch-and-bound algorithm for two-stage stochastic integer programs [J].
Ahmed, S ;
Tawarmalani, M ;
Sahinidis, NV .
MATHEMATICAL PROGRAMMING, 2004, 100 (02) :355-377
[2]   Parallel algorithms to solve two-stage stochastic linear programs with robustness constraints [J].
Beraldi, P ;
Grandinetti, L ;
Musmanno, R ;
Triki, C .
PARALLEL COMPUTING, 2000, 26 (13-14) :1889-1908
[3]   Evaluating solvency versus efficiency performance and different forms of organization and marketing in US property - liability insurance companies [J].
Brockett, PL ;
Cooper, WW ;
Golden, LL ;
Rousseau, JJ ;
Wang, YY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 154 (02) :492-514
[4]   DECISION-PROBLEMS UNDER RISK AND CHANCE CONSTRAINED PROGRAMMING - DILEMMAS IN THE TRANSITION - RESPONSE [J].
CHARNES, A ;
COOPER, WW .
MANAGEMENT SCIENCE, 1983, 29 (06) :750-753
[5]  
Charnes A., 1972, OPTIMIZING METHODS S, P391
[6]   Convergence properties of two-stage stochastic programming [J].
Dai, L ;
Chen, CH ;
Birge, JR .
JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 2000, 106 (03) :489-509
[7]  
DEBJANI C, 2002, FUZZY SETS SYSTEMS, V125, P327
[8]   Assessing the robustness of adaptation decisions to climate change uncertainties: A case study on water resources management in the East of England [J].
Dessai, Suraje ;
Hulme, Mike .
GLOBAL ENVIRONMENTAL CHANGE-HUMAN AND POLICY DIMENSIONS, 2007, 17 (01) :59-72
[9]   OPERATIONS ON FUZZY NUMBERS [J].
DUBOIS, D ;
PRADE, H .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1978, 9 (06) :613-626
[10]   ISMISIP: an inexact stochastic mixed integer linear semi-infinite programming approach for solid waste management and planning under uncertainty [J].
Guo, P. ;
Huang, G. H. ;
He, L. .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2008, 22 (06) :759-775