Forecasting transboundary river water elevations from space

被引:88
作者
Biancamaria, S. [1 ]
Hossain, F. [2 ]
Lettenmaier, D. P. [1 ]
机构
[1] Univ Washington, Dept Civil & Environm Engn, Seattle, WA 98195 USA
[2] Tennessee Technol Univ, Dept Civil & Environm Engn, Cookeville, TN 38505 USA
关键词
BASINS; GANGES; FLOODS;
D O I
10.1029/2011GL047290
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Over 90% of Bangladesh's surface water is generated upstream of its border, yet no real-time information is shared by India (the upstream country) with respect to two major transboundary rivers, the Ganges and Brahmaputra. This constraint limits operational forecasts of river states inside Bangladesh to lead times of no more than three days. Topex/Poseidon satellite altimetry measurements of water levels in India, combined with in-situ measurements inside Bangladesh allow extension of this lead time. We show that for both rivers, it is practically feasible to forecast water elevation anomalies during the critical monsoon season (June to September) near the Bangladesh border with an RMSE of about 0.40 m for lead times up to 5-days. Longer 10-day forecasts have higher errors (RMSE between 0.60 m and 0.80 m) but still provide useful information for operational applications. These results demonstrate the tremendous potential of satellite altimetry for transboundary river management. Citation: Biancamaria, S., F. Hossain, and D. P. Lettenmaier (2011), Forecasting transboundary river water elevations from space, Geophys. Res. Lett., 38, L11401, doi:10.1029/2011GL047290.
引用
收藏
页数:5
相关论文
共 10 条
[1]  
Ahmad QK, 2003, NAT HAZARDS, V28, P181
[2]   Short note: A review of state of the art on treaties in relation to management of transboundary flooding in international river basins and the Global Precipitation Measurement mission [J].
Balthrop, Caitlin ;
Hossain, Faisal .
WATER POLICY, 2010, 12 (05) :635-640
[3]   Using satellite altimetry data to augment flow estimation techniques on the Mekong River [J].
Birkinshaw, S. J. ;
O'Donnell, G. M. ;
Moore, P. ;
Kilsby, C. G. ;
Fowler, H. J. ;
Berry, P. A. M. .
HYDROLOGICAL PROCESSES, 2010, 24 (26) :3811-3825
[4]   A 1-10-Day Ensemble Forecasting Scheme for the Major River Basins of Bangladesh: Forecasting Severe Floods of 2003-07 [J].
Hopson, Thomas M. ;
Webster, Peter J. .
JOURNAL OF HYDROMETEOROLOGY, 2010, 11 (03) :618-641
[5]   Large-scale controls on Ganges and Brahmaputra river discharge on intraseasonal and seasonal time-scales [J].
Jian, Jun ;
Webster, Peter J. ;
Hoyos, Carlos D. .
QUARTERLY JOURNAL OF THE ROYAL METEOROLOGICAL SOCIETY, 2009, 135 (639) :353-370
[6]   Louisiana Wetland Water Level Monitoring Using Retracked TOPEX/POSEIDON Altimetry [J].
Lee, Hyongki ;
Shum, C. K. ;
Yi, Yuchan ;
Ibaraki, Motomu ;
Kim, Jin-Woo ;
Braun, Alexander ;
Kuo, Chung-Yen ;
Lu, Zhong .
MARINE GEODESY, 2009, 32 (03) :284-302
[7]   Water Resources Modeling of the Ganges-Brahmaputra-Meghna River Basins Using Satellite Remote Sensing Data1 [J].
Nishat, Bushra ;
Rahman, S. M. Mahbubur .
JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2009, 45 (06) :1313-1327
[8]  
Rodriguez E., 2009, SWOT science requirements Document
[9]   EXTENDED-RANGE PROBABILISTIC FORECASTS OF GANGES AND BRAHMAPUTRA FLOODS IN BANGLADESH [J].
Webster, Peter J. ;
Jian, Jun ;
Hopson, Thomas M. ;
Hoyos, Carlos D. ;
Agudelo, Paula A. ;
Chang, Hai-Ru ;
Curry, Judith A. ;
Grossman, Robert L. ;
Palmer, Timothy N. ;
Subbiah, A. R. .
BULLETIN OF THE AMERICAN METEOROLOGICAL SOCIETY, 2010, 91 (11) :1493-1514
[10]  
Wolf A., 1999, WATER RESOURCES DEV, V15, P387, DOI DOI 10.1080/07900629948682