Investment planning for electricity generation expansion in a hydro dominated environment

被引:16
作者
Kenfack, F [1 ]
Guinet, A [1 ]
Ngundam, JM [1 ]
机构
[1] Inst Natl Sci Appl, Lab PRISMA, F-69621 Villeurbanne, France
关键词
scheduling; modelling; generation expansion; Branch and Bound technique; planning; hydrothermal system; Benders technique;
D O I
10.1002/er.732
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents the investment planning model, which has been developed to rigorously valorize the large hydroelectric potential resources of Cameroon. Based on Benders technique, the decomposition approach proposed allows each component of the problem (investment and operation) to be conveniently modelled and solved by adapted methods. Furthermore, the relative small size of the actual system, the long experience of the manual generation management in use over a long time by the national electricity company (Sonel), and the fundamental data of the problem are exploited as the basis of the approach, to define a more detailed and adapted model. Formulated as a multistage mixed linear programming problem, the decomposition procedure of the Benders technique is applied to isolate from the problem so modelled its two main subproblems (investment and operation). The investment subproblem is modelled as a multistage mixed linear programming problem and solved by a branch and bound technique. The operation subproblem is represented as a multistage stochastic linear problem and solved by a revised simplex-based method. Subsequently, a solution algorithm for the whole problem, defined by a finite iterative process where the subproblems are alternatively solved, is derived from the co-ordination procedure of Benders technique. Case studies with the southern interconnected network of the Sonel system are presented and analysed. Copyright (C) 2001 John Wiley & Sons, Ltd.
引用
收藏
页码:927 / 937
页数:11
相关论文
共 13 条
[1]  
[Anonymous], J OPT THEORY APPL
[2]  
BENDERS JF, 1962, NUMER MATH, V4, P238, DOI [10.1007/BF01386316, DOI 10.1007/BF01386316, DOI 10.1007/S10287-004-0020-Y]
[3]  
COSTA JP, 1990, PROCEEDINGS OF THE TENTH POWER SYSTEMS COMPUTATION CONFERENCE, P40
[4]  
COTE G, 1979, ELEC POWER ENERGY SY, V1, P1
[5]   AN OVERVIEW OF ANALYSIS TOOLS FOR INTEGRATED RESOURCE PLANNING [J].
ETO, JH .
ENERGY, 1990, 15 (11) :969-977
[6]   SHORT-TERM RESOURCE SCHEDULING IN MULTI-AREA HYDROTHERMAL POWER-SYSTEMS [J].
FERREIRA, LAFM ;
ANDERSSON, T ;
IMPARATO, CF ;
MILLER, TE ;
PANG, CK ;
SVOBODA, A ;
VOJDANI, AF .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1989, 11 (03) :200-212
[7]   ELEMENTS OF LARGE-SCALE MATHEMATICAL PROGRAMMING .1. CONCEPTS [J].
GEOFFRION, AM .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (11) :652-675
[8]   POWER-SYSTEM EXPANSION PLANNING UNDER UNCERTAINTY [J].
GORENSTIN, BG ;
CAMPODONICO, NM ;
COSTA, JP ;
PEREIRA, MVF ;
DEEB, N .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (01) :129-136
[9]   OPTIMIZATION METHODS FOR ELECTRIC UTILITY RESOURCE PLANNING [J].
HOBBS, BF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 83 (01) :1-20
[10]  
KENFACK F, 1998, THESIS ECOLE POLYTEC, P238