Coordinating a two-level supply chain with production interruptions to restore process quality

被引:16
作者
El Saadany, Ahmed M. A. [1 ]
Jaber, Mohamad Y. [1 ]
机构
[1] Ryerson Univ, Dept Mech & Ind Engn, Toronto, ON M5B 2K3, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
quality and inventory; process improvement; supply chain coordination;
D O I
10.1016/j.cie.2007.06.037
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The classical inventory model, known as the lot size problem (LSP), assumes items produced and stocked to be of perfect quality. In reality, production processes are not defect free. Such imperfect processes generate defects that are reworked, and in some cases scrapped. The move by practitioners towards smaller lot sizes; e.g., just-in-time (JIT), as a mean of improving process and product quality prompted researchers to modify the LSP to represent reality more faithfully. The studies conducted by these researchers confirmed the observed benefits of smaller lot sizes. The inventory models developed in these studies assume that defects increase as the lot size increases, and that adjusting the process within a production cycle is not possible. Contrary to this assumption, in a JIT environment workers are authorized to stop production if a quality or production problem arises. This practice encouraged Khouja [Khouja, M. (2005). The use of minor setups within production cycles to improve product quality and yield. International Transactions in Operations Research, 12(4), 403-416] to reformulate some inventory models which take into account the negative relationship between lot size and quality and the possibility of performing minor setups. This requires stopping the process during a production cycle. This paper investigates the work of Khouja in a centralized decision model where players in a two-level (manufacturer-retailer) supply chain coordinate their orders to minimize their local costs and that of the chain. Mathematical models are developed with numerical results discussed. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:95 / 109
页数:15
相关论文
共 22 条
  • [1] THE IMPACT OF DEFECTS ON A PROCESS WITH REWORK
    AGNIHOTHRI, SR
    KENETT, RS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 80 (02) : 308 - 327
  • [2] [Anonymous], 1999, EUROPEAN J PURCHASIN, DOI DOI 10.1016/S0969-7012(98)00017-3
  • [3] Billington P. J., 2003, J AM ACAD BUSINESS, V3, P409
  • [4] The economics of yield-driven processes
    Bohn, RE
    Terwiesch, C
    [J]. JOURNAL OF OPERATIONS MANAGEMENT, 1999, 18 (01) : 41 - 59
  • [5] The structure of manufacturing systems: Insights on the impact of variability
    Buzacott, JA
    [J]. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1999, 11 (02): : 127 - 146
  • [6] COMPARISON BETWEEN JUST-IN-TIME AND EOQ-SYSTEM
    CHYR, F
    LIN, TM
    HO, CF
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1990, 18 (03): : 233 - 240
  • [7] Joint optimization of process improvement investments for supplier-buyer cooperative commerce
    Comeaux, EJ
    Sarker, BR
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (11) : 1310 - 1324
  • [8] DELL M, 1999, DIRECT DELL STRATEGI
  • [9] DOLAN RJ, 1987, MARKET SCI, V6, P1, DOI 10.1287/mksc.6.1.1
  • [10] A simple integrated production policy of an imperfect item for vendor and buyer
    Goyal, SK
    Huang, CK
    Chen, KC
    [J]. PRODUCTION PLANNING & CONTROL, 2003, 14 (07) : 596 - 602