Optimal Joint Energy and Secondary Regulation Reserve Hourly Scheduling of Variable Speed Pumped Storage Hydropower Plants

被引:99
作者
Chazarra, Manuel [1 ]
Ignacio Perez-Diaz, Juan [1 ]
Garcia-Gonzalez, Javier [2 ]
机构
[1] Univ Politecn Madrid, Escuela Ingenieros Caminos Canales & Puertos, Dept Hydraul Energy & Environm Engn, E-28040 Madrid, Spain
[2] Comillas Pontifical Univ, ICAI Sch Engn, Inst Res Technol, Madrid 28015, Spain
关键词
Pumped storage plant; secondary regulation service; variable speed technology; risk aversion; scenario-based approach; ELECTRICITY MARKET; OPTIMIZATION MODEL; OPERATION; STRATEGIES;
D O I
10.1109/TPWRS.2017.2699920
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
This paper presents a mixed integer linear programming model for the hourly energy and secondary regulation reserve scheduling of a price-taker and closed-loop variable speed pumped-storage hydropower plant, considering the energy losses due to the use of electronic frequency converters. The plant participates in the day-ahead energy market and in the secondary regulation service of the Iberian electric power system. The model is utilised to compare the income of the plant with and without considering the variable speed technology, with synchronous or asynchronous machines, with and without bypassing the frequency converter in generating mode, and with and without perfect information of the electric power system data. Numerical testing results demonstrate that the operation with the variable speed technology could help notably to enlarge the income of the power plant and that the secondary regulation reserve market might be the main source of revenue for the power plant.
引用
收藏
页码:103 / 115
页数:13
相关论文
共 35 条
[1]
Alizadeh-Mousavi O., 2016, P POW SYST COMP C, P1
[2]
[Anonymous], P 12 INT C EUR EN MA
[3]
[Anonymous], SEL HYDR REACT TURB
[4]
[Anonymous], 2011, CLUSTER ANAL
[5]
[Anonymous], 2009, 41 N AM POWER S, DOI DOI 10.1109/NAPS.2009.5484054
[6]
[Anonymous], P EUR EN MARK
[7]
[Anonymous], 2014, FACTS WORTH KNOW FRE
[8]
[Anonymous], 1985, HYDROPOWER DESIGN US
[9]
[Anonymous], 2005, ANAL 300 MW VARIABLE
[10]
Are J. Suul, 2009, RENEW ENERGY