Combinatorial optimization models for production scheduling in automated manufacturing systems

被引:81
作者
Crama, Y
机构
[1] Ecole d'Administration des Affaires, Université de Liège, 4000 Liège
关键词
scheduling theory; combinatorial optimization; flexible manufacturing systems; tool management; robotic cells;
D O I
10.1016/S0377-2217(96)00388-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Production planning and scheduling models arising in automated manufacturing environments exhibit several features not encountered in models developed for traditional production systems. For instance, models of automated facilities typically include tooling constraints which reflect the possibility for a machine to use different tools in order to perform successive operations, within limits imposed by the size of the tool magazine. Also, these models often account for the existence of flexible material handling systems whose activities must be synchronized with the machining operations in order to optimize system utilization. In this paper, we describe a few interesting combinatorial optimization problems proposed in this framework, we point to their relationships with models investigated in seemingly remote areas, and we identify a number of challenging open problems. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:136 / 153
页数:18
相关论文
共 126 条
[1]   FLOW MANAGEMENT IN FLEXIBLE MANUFACTURING CELLS WITH PIPELINE OPERATIONS [J].
AGNETIS, A ;
LUCERTINI, M ;
NICOLO, F .
MANAGEMENT SCIENCE, 1993, 39 (03) :294-306
[2]  
Agnetis A, 1996, IIE TRANS, V28, P911
[3]  
AGNETIS A, 1993, OPTIMIZATION IND, P81
[4]  
AHMADI RH, 1993, PERSPECTIVES OPERATI, P409
[5]  
Amoako-Gyampah K., 1994, International Journal of Flexible Manufacturing Systems, V6, P179, DOI 10.1007/BF01328811
[6]  
[Anonymous], ROBOTS MANUFACTURING
[7]  
[Anonymous], 1966, Management Science, DOI DOI 10.1287/MNSC.12.7.485
[8]   A BOUNDING SCHEME FOR DERIVING THE MINIMAL CYCLE TIME OF A SINGLE-TRANSPORTER N-STAGE PROCESS WITH TIME-WINDOW CONSTRAINTS [J].
ARMSTRONG, R ;
LEI, L ;
GU, SH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (01) :130-140
[9]  
Askin R.G., 1993, MODELING ANAL MANUFA
[10]   NONLINEAR 0-1 PROGRAMMING .1. LINEARIZATION TECHNIQUES [J].
BALAS, E ;
MAZZOLA, JB .
MATHEMATICAL PROGRAMMING, 1984, 30 (01) :1-21