Multiple time period imputation technique for multiple missing traffic variables: nonparametric regression approach

被引:15
作者
Chang, Hyunho [2 ]
Park, Dongjoo [1 ]
Lee, Younginn [2 ]
Yoon, Byoungjo [3 ]
机构
[1] Univ Seoul, Dept Transportat Engn, Seoul, South Korea
[2] Seoul Natl Univ, Grad Sch Environm Studies, Seoul, South Korea
[3] Univ Incheon, Coll Urban Soc, Inchon, South Korea
关键词
multivariate; multiple time periods; imputation; system-oriented approach; NPR; FLOW; PREDICTION; MODEL;
D O I
10.1139/L2012-018
中图分类号
TU [建筑科学];
学科分类号
081407 [建筑环境与能源工程];
摘要
The objective of this study is to introduce an effective and practical model, based on non-parametric regression, to instantaneously estimate multivariate imputations replacing multiple missing variables during multiple time periods. The developed model was essentially designed for system-oriented, real-world applications. In an empirical study with real-world data, the proposed model, on the whole, outperformed the seasonal auto-regressive integrated moving average (ARIMA). The analysis of the results indicates that the introduced model was more applicable to multivariate imputation during multiple time intervals than that of ARIMA. In addition, it was revealed that ARIMA could somewhat deform the relationship between the volume (q) and speed (s), whereas the developed model reproduced the q-s relationship more similarly than ARIMA. Moreover, the proposed model is very simple and does not require system operators to input or recalibrate any external parameters because it was developed for applications of real data management systems.
引用
收藏
页码:448 / 459
页数:12
相关论文
共 34 条
[1]
[Anonymous], 3001 WARD WASH STAT
[2]
[Anonymous], TRANSP RES REC
[3]
Chandra C., 2004, TRB ANN M
[4]
Chang H., 2011, P 90 ANN M TRANSP RE
[5]
Dynamic multi-interval bus travel time prediction using bus transit data [J].
Chang, Hyunho ;
Park, Dongjoo ;
Lee, Seungjae ;
Lee, Hosang ;
Baek, Seungkirl .
TRANSPORTMETRICA, 2010, 6 (01) :19-38
[6]
Nonparametric regression based short-term load forecasting [J].
Charytoniuk, W ;
Chen, MS ;
Van Olinda, P .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (03) :725-730
[7]
Chen C., 2003, TRB ANN M
[8]
NONPARAMETRIC REGRESSION AND SHORT-TERM FREEWAY TRAFFIC FORECASTING [J].
DAVIS, GA ;
NIHAN, NL .
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1991, 117 (02) :178-188
[9]
MAXIMUM LIKELIHOOD FROM INCOMPLETE DATA VIA EM ALGORITHM [J].
DEMPSTER, AP ;
LAIRD, NM ;
RUBIN, DB .
JOURNAL OF THE ROYAL STATISTICAL SOCIETY SERIES B-METHODOLOGICAL, 1977, 39 (01) :1-38
[10]
DISBRO JE, 1989, FHWANYSR9891 NEW YOR