Improved merit order and augmented Lagrange Hopfield network for short term hydrothermal scheduling

被引:42
作者
Dieu, Vo Ngoc [1 ]
Ongsakul, Weerakorn [1 ]
机构
[1] Asian Inst Technol, Energy Field Study, Sch Environm Resources & Dev, Klongluang, Pathumthani, Thailand
关键词
Augmented Lagrange Hopfield network; Merit order; Heuristic search; Short term hydrothermal scheduling; UNIT COMMITMENT; TRANSMISSION; CONSTRAINTS; RELAXATION;
D O I
10.1016/j.enconman.2009.07.021
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper proposes an improved merit order (IMO) combined with an augmented Lagrangian Hopfield network (ALHN) for solving short term hydrothermal scheduling (HTS) with pumped-storage hydro plants. The proposed IMO-ALHN consists of a merit order based on the average production cost of generating units enhanced by heuristic search algorithm for finding unit scheduling and a continuous Hopfield neural network with its energy function based on augmented Lagrangian relaxation for solving constrained economic dispatch (CED). The proposed method is applied to solve the HTS problem in five stages including thermal, hydro and pumped-storage unit commitment by IMO and heuristic search, constraint violations repairing by heuristic search and CED by ALHN. The proposed method is tested on the 24-bus IEEE RTS with 32 units including 4 fuel-constrained, 4-hydro, and 2 pumped-storage units scheduled over a 24-h period. Test results indicate that the proposed IMO-ALHN is efficient for hydrothermal systems with various constraints. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:3015 / 3023
页数:9
相关论文
共 29 条
[1]   A practical resource scheduling with OPF constraints [J].
AbdulRahman, KH ;
Shahidehpour, SM ;
Aganagic, M ;
Mokhtari, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) :254-259
[2]   Hydrothermal scheduling by augmented Lagrangian: Consideration of transmission constraints and pumped-storage units [J].
Al-Agtash, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) :750-756
[3]   Augmented Lagrangian approach to hydro-thermal scheduling [J].
Al-Agtash, S ;
Su, RJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (04) :1392-1400
[4]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[5]   Hydro-thermal scheduling by tabu search and decomposition method [J].
Bai, XM ;
Shahidehpour, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) :968-974
[6]   Hopfield neural networks for optimal scheduling of fixed head hydrothermal power systems [J].
Basu, M .
ELECTRIC POWER SYSTEMS RESEARCH, 2003, 64 (01) :11-15
[7]   Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination [J].
Chen, PH ;
Hang, HG .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) :975-981
[8]   A direct Newton-Raphson economic emission dispatch [J].
Chen, SD ;
Chen, JF .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2003, 25 (05) :411-417
[9]   Enhanced augmented Lagrangian Hopfield network for unit commitment [J].
Dieu, V. N. ;
Ongsakul, W. .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (06) :624-632
[10]  
Dieu V.N., 2005, P 15 POW SYST COMP C