An examination of the costs and critical characteristics of electric utility distribution system capacity enhancement projects

被引:18
作者
Balducci, Patrick J. [1 ]
Schienbein, Lawrence A. [1 ]
Nguyen, Tony B. [1 ]
Brown, Daryl R. [1 ]
Fathelrahman, Eihab M. [1 ]
机构
[1] Battelle Mem Inst, Pacific Northwest Natl Lab, US Dept Energy, Richland, WA 99352 USA
来源
2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3 | 2006年
关键词
distribution system capacity enhancement; cost deferment; demand-side management; distributed energy resources; distribution system upgrade;
D O I
10.1109/TDC.2006.1668461
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 [电气工程]; 0809 [电子科学与技术];
摘要
This paper classifies and analyzes the capital and total costs for 172 electricity distribution system capacity enhancement projects undertaken during 1995-2002 or planned in the 2003-2011 time period by three electric power utilities in the Western United States. Projects were sorted into eight categories: capacitors, load transfer, new feeder, new line, new substation, new transformer, reconductoring, and substation capacity increase. Capital cost and total cost frequency distributions were constructed along with descriptive statistics for each project type. Ordinary Least Squares (OLS) regression analysis was performed to determine how various project variables (e.g., project location and primary customer served by the project) impact the unit costs. Distribution system capital costs averaged $51/kVA of additional capacity and varied significantly by project type. New substations and new transformers were the most costly, $112/kVA and $87/kVA respectively, while reconductoring and substation capacity increase were found to be the least expensive ($21/kVA). Using the full costs of delivering electricity over the 30-year life of a project increased the mean project cost to $100/kVA. The OLS analysis revealed that the primary determinant of total project cost is project type. Other variables, such as the geographic location of the project and primary customer served, did not yield statistically significant results.
引用
收藏
页码:78 / +
页数:2
相关论文
共 4 条
[1]
[Anonymous], PNNL14396
[2]
DOANE J, 1976, 504029 JPL CALTECH
[3]
*EN INF ADM, 1999, ANN EN OUTL 2000
[4]
*PORTL GEN EL CO, 2003, DEL NEW CHOIC PGES S