Using MLP networks to design a production scheduling system

被引:38
作者
Feng, S [1 ]
Li, L
Cen, L
Huang, JP
机构
[1] Huazhong Univ Sci & Technol, Dept Control Sci & Engn, Wuhan 430074, Peoples R China
[2] Old Dominion Univ, Coll Business & Publ Adm, Dept Informat Syst & Decis Sci, Norfolk, VA 23529 USA
关键词
multi-layered perceptron; artificial neural networks; manufacturing; production activity scheduling; operations management;
D O I
10.1016/S0305-0548(02)00044-8
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper investigates the application of artificial neural networks to the problem of job shop scheduling with a scope of a deterministic time-varying demand pattern over a fixed planning horizon. The purpose of the research is to design and develop a job shop scheduling system (a scheduling software) that can generate effective job shop schedules using the multi-layered perceptron (MLP) networks. The contributions of this study include designing, developing, and implementing a production activity scheduling system using the MLP networks; developing a method for organizing sample data using a denotation bit to indicate processing sequence and processing time of a job simultaneously; using the back-propagation training process to control local minimal solutions; and developing a heuristics to improve and revise the initial production schedule. The proposed production activity schedule system is tested in a real production environment and illustrated in the paper with a sample case. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:821 / 832
页数:12
相关论文
共 26 条
[1]   Artificial neural network based electrical load prediction for food retail stores [J].
Datta, D ;
Tassou, SA .
APPLIED THERMAL ENGINEERING, 1998, 18 (11) :1121-1128
[2]   FINDING SOME ESSENTIAL CHARACTERISTICS OF FEASIBLE SOLUTIONS FOR A SCHEDULING PROBLEM [J].
ERSCHLER, J ;
ROUBELLAT, F ;
VERNHES, JP .
OPERATIONS RESEARCH, 1976, 24 (04) :774-783
[3]   Decision support for fuzzy comprehensive evaluation of urban development [J].
Feng, S ;
Xu, LD .
FUZZY SETS AND SYSTEMS, 1999, 105 (01) :1-12
[4]   An object-oriented intelligent design tool to aid the design of manufacturing systems [J].
Feng, S ;
Li, LX ;
Cen, L .
KNOWLEDGE-BASED SYSTEMS, 2001, 14 (5-6) :225-232
[5]   An intelligent decision support system for fuzzy comprehensive evaluation of urban development [J].
Feng, S ;
Xu, LD .
EXPERT SYSTEMS WITH APPLICATIONS, 1999, 16 (01) :21-32
[6]  
FENG S, 1998, P INT C LARG SCAL SY, V2, P1066
[7]   A neural network model for solving the lot-sizing problem [J].
Gaafar, LK ;
Choueiki, MH .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2000, 28 (02) :175-184
[8]   Scheduling railway freight cars [J].
Geng, GY ;
Li, LX .
KNOWLEDGE-BASED SYSTEMS, 2001, 14 (5-6) :289-297
[9]  
HUANG J, 2000, J HUAZHONG U SCI TEC, V8, P27
[10]   Job-shop scheduling using neural networks [J].
Jain, AS ;
Meeran, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (05) :1249-1272