A mixed integer programming model for advanced planning and scheduling (APS)

被引:56
作者
Chen, Kejia [1 ]
Ji, Ping [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
scheduling; MRP; advanced planning and scheduling; mixed integer programming;
D O I
10.1016/j.ejor.2006.06.018
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a mixed integer programming (MIP) model which succeeds in a system integration of the production planning and shop floor scheduling problems. The proposed advanced planning and scheduling (APS) model explicitly considers capacity constraints, operation sequences, lead times and due dates in a multi-order environment. The objective of the model is to seek the minimum cost of both production idle time and tardiness or earliness penalty of an order. The output of the model is operation schedules with order starting time and finish time. Numerical result shows that the suggested APS model can favorably produce optimal schedules. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:515 / 522
页数:8
相关论文
共 19 条
[1]  
Agrawal A, 1996, IIE TRANS, V28, P653
[2]  
BAHL HC, 1984, J OPER RES SOC, V35, P389, DOI 10.2307/2581367
[3]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[4]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[5]   SURVEY OF SCHEDULING RESEARCH INVOLVING DUE DATE DETERMINATION DECISIONS [J].
CHENG, TCE ;
GUPTA, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) :156-166
[6]   SCHEDULING PRODUCTS WITH BILLS OF MATERIALS USING AN IMPROVED LAGRANGIAN-RELAXATION TECHNIQUE [J].
CZERWINSKI, CS ;
LUH, PB .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1994, 10 (02) :99-111
[7]   ON PRACTICAL RESOURCE-ALLOCATION FOR PRODUCTION PLANNING AND SCHEDULING WITH PERIOD OVERLAPPING SETUPS [J].
DILLENBERGER, C ;
ESCUDERO, LF ;
WOLLENSAK, A ;
WU, Z .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) :275-286
[8]   SCHEDULING TASKS WITH DUE DATES IN A FABRICATION ASSEMBLY PROCESS [J].
FAALAND, B ;
SCHMITT, T .
OPERATIONS RESEARCH, 1987, 35 (03) :378-388
[9]   A survey of the state-of-the-art of common due date assignment and scheduling research [J].
Gordon, V ;
Proth, JM ;
Chu, CB .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 139 (01) :1-25
[10]  
HASTINGS NAJ, 1982, J OPER RES SOC, V33, P1021