Transmission assets investment timing using net present value curves

被引:8
作者
Garcia, Reinaldo C. [2 ]
Contreras, Javier [1 ]
Correia, Pedro F. [3 ]
Munoz, Jose I. [1 ]
机构
[1] Univ Castilla La Mancha, ETS Ingenieros Ind, E-13071 Ciudad Real, Spain
[2] Univ Brasilia Asa Norte, Fac Tecnol, BR-70910900 Brasilia, DF, Brazil
[3] Univ Tecn Lisboa, Inst Super Tecn, P-1049001 Lisbon, Portugal
关键词
Transmission investment; Financial transmission rights; Net present value curve; ELECTRIC-POWER TRANSMISSION; GRID INVESTMENT; MECHANISM; BEHAVIOR; RIGHTS;
D O I
10.1016/j.enpol.2009.10.012
中图分类号
F [经济];
学科分类号
02 ;
摘要
Improvement and expansion of the transmission grid is still an unresolved issue in the new competitive environment. In current electricity markets, transmission lines have become assets that need financial instruments for investors who wish to ensure steady long-term returns and to withstand short-term market volatility. The timing and the combination of new transmission investments is key to analyze their long-term effects. This paper presents the concept of net present value (NPV) curve to estimate the best investment time for the investor, where the curve is constructed by calculating the NPVs resulting from the investment in successive years. A specific contract model based on financial transmission rights (FTR) is used for the NPV evaluation of transmission assets, and the stochastic properties of all variables related to the investment market structure are considered. The model is applied to the IEEE 24-bus Reliability Test System (RTS) showing the approach capabilities as a decision-aid tool for transmission investors. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:598 / 605
页数:8
相关论文
共 19 条
[1]   Border flow rights and contracts for differences of differences: Models for electric transmission property rights [J].
Baldick, Ross .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :1495-1506
[2]   Improving private incentives for electric grid investment [J].
Bushnell, JB ;
Stoft, SE .
RESOURCE AND ENERGY ECONOMICS, 1997, 19 (1-2) :85-108
[3]   Electric grid investment under a contract network regime [J].
Bushnell, JB ;
Stoft, SE .
JOURNAL OF REGULATORY ECONOMICS, 1996, 10 (01) :61-79
[4]  
CAROOCHOA P, 2003, THESIS U ILLINOIS UR
[5]   A market mechanism for electric power transmission [J].
Chao, HP ;
Peck, S .
JOURNAL OF REGULATORY ECONOMICS, 1996, 10 (01) :25-59
[6]   Inclusion method in the work-hardening behavior of transversely isotropic composites [J].
Chao, LP ;
Huang, JH .
JOURNAL OF THERMOPLASTIC COMPOSITE MATERIALS, 2000, 13 (01) :58-74
[7]   INVESTMENT UNDER UNCERTAINTY - DIXIT,AK, PINDYCK,RS [J].
SCHWARTZ, ES .
JOURNAL OF FINANCE, 1994, 49 (05) :1924-1928
[8]   Transmission rights and transmission expansions [J].
Gribik, PR ;
Shirmohammadi, D ;
Graves, JS ;
Kritikson, JG .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (04) :1728-1737
[9]   The IEEE reliability test system - 1996 [J].
Grigg, C ;
Wong, P ;
Albrecht, P ;
Allan, R ;
Bhavaraju, M ;
Billinton, R ;
Chen, Q ;
Fong, C ;
Haddad, S ;
Kuruganty, S ;
Li, W ;
Mukerji, R ;
Patton, D ;
Rau, N ;
Reppen, D ;
Schneider, A ;
Shahidehpour, M ;
Singh, C .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) :1010-1018
[10]  
HOGAN W., 2003, TRANSMISSION MARKET