Uncertainty assessment of a process-based integrated catchment model of phosphorus

被引:79
作者
Dean, Sarah [1 ]
Freer, Jim [1 ]
Beven, Keith [1 ]
Wade, Andrew J. [2 ]
Butterfield, Dan [2 ]
机构
[1] Univ Lancaster, Lancaster Environm Ctr, Lancaster LA1 4YQ, England
[2] Univ Reading, Dept Geog, Aquat Environm Res Ctr, Reading RG6 6AB, Berks, England
关键词
INCA-P; GLUE; Uncertainty estimation; Phosphorus models; Diffuse agricultural pollution; Water quality modelling; IN-STREAM PHOSPHORUS; WATER-QUALITY; SENSITIVITY-ANALYSIS; EPIPHYTE DYNAMICS; GLUE METHODOLOGY; INDICATORS TOOL; RIVER-SYSTEMS; NITROGEN; EQUIFINALITY; EXPORT;
D O I
10.1007/s00477-008-0273-z
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Despite the many models developed for phosphorus concentration prediction at differing spatial and temporal scales, there has been little effort to quantify uncertainty in their predictions. Model prediction uncertainty quantification is desirable, for informed decision-making in river-systems management. An uncertainty analysis of the process-based model, integrated catchment model of phosphorus (INCA-P), within the generalised likelihood uncertainty estimation (GLUE) framework is presented. The framework is applied to the Lugg catchment (1,077 km(2)), a River Wye tributary, on the England-Wales border. Daily discharge and monthly phosphorus (total reactive and total), for a limited number of reaches, are used to initially assess uncertainty and sensitivity of 44 model parameters, identified as being most important for discharge and phosphorus predictions. This study demonstrates that parameter homogeneity assumptions (spatial heterogeneity is treated as land use type fractional areas) can achieve higher model fits, than a previous expertly calibrated parameter set. The model is capable of reproducing the hydrology, but a threshold Nash-Sutcliffe co-efficient of determination (E or R (2)) of 0.3 is not achieved when simulating observed total phosphorus (TP) data in the upland reaches or total reactive phosphorus (TRP) in any reach. Despite this, the model reproduces the general dynamics of TP and TRP, in point source dominated lower reaches. This paper discusses why this application of INCA-P fails to find any parameter sets, which simultaneously describe all observed data acceptably. The discussion focuses on uncertainty of readily available input data, and whether such process-based models should be used when there isn't sufficient data to support the many parameters.
引用
收藏
页码:991 / 1010
页数:20
相关论文
共 61 条
[1]   Defining the sources of low-flow phosphorus transfers in complex catchments [J].
Arnscheidt, J. ;
Jordan, P. ;
Li, S. ;
McCormick, S. ;
McFaul, R. ;
McGrogan, H. J. ;
Neal, M. ;
Sims, J. T. .
SCIENCE OF THE TOTAL ENVIRONMENT, 2007, 382 (01) :1-13
[2]   On the concept of delivery of sediment and nutrients to stream channels [J].
Beven, K ;
Heathwaite, L ;
Haygarth, P ;
Walling, D ;
Brazier, R ;
Withers, P .
HYDROLOGICAL PROCESSES, 2005, 19 (02) :551-556
[3]   A manifesto for the equifinality thesis [J].
Beven, K .
JOURNAL OF HYDROLOGY, 2006, 320 (1-2) :18-36
[4]   THE FUTURE OF DISTRIBUTED MODELS - MODEL CALIBRATION AND UNCERTAINTY PREDICTION [J].
BEVEN, K ;
BINLEY, A .
HYDROLOGICAL PROCESSES, 1992, 6 (03) :279-298
[5]   Towards an alternative blueprint for a physically based digitally simulated hydrologic response modelling system [J].
Beven, K .
HYDROLOGICAL PROCESSES, 2002, 16 (02) :189-206
[6]   Equifinality, data assimilation, and uncertainty estimation in mechanistic modelling of complex environmental systems using the GLUE methodology [J].
Beven, K ;
Freer, J .
JOURNAL OF HYDROLOGY, 2001, 249 (1-4) :11-29
[7]  
Beven K. J., 1996, Distributed hydrological modelling., P255
[8]  
Beven K. J., 2008, ENV MODELLING UNCERT
[9]   Uniqueness of place and process representations in hydrological modelling [J].
Beven, KJ .
HYDROLOGY AND EARTH SYSTEM SCIENCES, 2000, 4 (02) :203-213
[10]  
Brazier RE, 2000, EARTH SURF PROC LAND, V25, P825, DOI 10.1002/1096-9837(200008)25:8<825::AID-ESP101>3.0.CO